• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2019, Vol. 39 ›› Issue (3): 465-472.DOI: 10.3973/j.issn.2096-4498.2019.03.018

• 施工技术 • 上一篇    下一篇

浅埋小间距矩形顶管掘进姿态控制技术探讨

胡景军1, 豆小天2, 李志军2, 王晋波2, 赵李勇2, 李永蔷2   

  1. (1. 中铁隧道局集团有限公司, 广东 广州 511458; 2. 中铁隧道集团二处有限公司, 河北 三河 065201)
  • 收稿日期:2018-06-29 修回日期:2019-01-02 出版日期:2019-03-20 发布日期:2019-04-03
  • 作者简介:胡景军(1973—),男,内蒙古赤峰人,1996年毕业于辽宁工程技术大学,采矿工程专业,本科,高级工程师,主要从事铁路隧道技术管理工作。Email: 1132683687@qq.com。

Boring Attitude Control Technology for Shallowcovered and  Smallspacing Rectangular Pipe Jacking

HU Jingjun1, DOU Xiaotian2, LI Zhijun2, WANG Jinbo2, ZHAO Liyong2, LI Yongqiang2   

  1. (1. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China;  2. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)
  • Received:2018-06-29 Revised:2019-01-02 Online:2019-03-20 Published:2019-04-03

摘要:

为解决采用结构分割转换工法(CC工法)建造的某地下停车场小间距隧道群矩形顶管施工中顶管机出现栽头及掘进姿态控制困难的问题,结合项目施工过程的姿态监控数据,对产生栽头及姿态偏差的原因进行理论分析,提出相应的控制技术,并采取现场试验的方法进行效果验证。结果表明: 1)顶管机栽头现象的原因主要有顶管机体重心偏差、漏浆、姿态预留不够、后靠不稳; 2)通过设备和管节定位处理、洞门密封处理、增加始发姿态预留量、后靠稳定性控制等措施可有效防止顶管机栽头; 3)始发阶段采取洞门预留、破除等控制措施,掘进阶段控制掘进速度并辅以“E”型导向槽进行轴线控制等措施,可有效控制顶管机顶进姿态; 4)通过采取调整铰接油缸行程差、主推油缸行程差及姿态偏差方向的土压等姿态纠偏技术措施,取得了良好的施工效果。

关键词: 浅埋小间距隧道, 矩形顶管, 结构分割转换工法(CC工法), 防栽头, 姿态控制, 姿态纠偏

Abstract:

During the construction of smallspacing rectangular pipe jacking in an underground parking lot constructed by cut and convert (CC)method, problems such as the pipejacking machine declination and difficulty in controlling the jacking attitude often occur. Therefore, the causes for jacking declination and attitude deviation are theoretically analyzed based on attitude monitoring data, and corresponding control measures and field test are carried out. The results show that: (1) The causes for declination include machine body weight deviation, slurry leakage, insufficient attitude reservation and unstable backrest. (2) The declination can be effectively prevented by adopting measures such as equipment and pipe segment positioning, door sealing treatment, initial attitude reservation increasing and backrest stability control. (3) The door reservation and cutting during launching phase and boring speed control and Eshaped guide groove for axis control during jacking phase can effectively control the jacking attitude. (4) By adjusting the stroke difference of the articulated cylinder and the main push cylinder and the earth pressure along the direction of the attitude deviation, good effect has been achieved.

Key words: shallowcovered and smallspacing tunnel, rectangular pipejacking, structural cut and convert (CC) method, declination prevention, boring attitude control, boring attitude adjustment