隧道建设(中英文) ›› 2020, Vol. 40 ›› Issue (3): 411-416.DOI: 10.3973/j.issn.2096-4498.2020.03.014

• 施工技术 • 上一篇    下一篇

改进型管井降水技术的研究与应用

陈小羊1, 徐 桃1, 张 浩2, ∗, 张 峰2, 郭茶发2   

  1. (1. 中建七局交通建设公司, 河南 郑州 450004; 2. 中建海峡建设发展有限公司, 福建 福州 350003)
  • 收稿日期:2019-08-28 出版日期:2020-03-20 发布日期:2020-04-09
  • 作者简介:陈小羊(1973—),男,安徽望江人,1997 年毕业于石家庄铁道学院,桥梁工程专业,本科,高级工程师,现从事基础设施施工技术管理 工作。 E-mail: 1471635300@ qq. com。 ?通信作者: 张浩, E-mail: zhanghao08022@ 163. com。

Research and Application of Improved Tube Well Dewatering Technology

CHEN Xiaoyang1, XU Tao1, ZHANG Hao2, ∗, ZHANG Feng2, GUO Chafa2   

  1. (1. Transportation Company of China Construction Seventh Engineering Division Co., Ltd., Zhengzhou 450004, Henan, China; 2. CSCES Strait Construction and Development Co., Ltd., Fuzhou 350003, Fujian, China)
  • Received:2019-08-28 Online:2020-03-20 Published:2020-04-09

摘要:

在暗挖法隧道施工过程中,为了保证开挖面的稳定,开挖之前需要进行降水。常规的管井降水技术中,过滤层是开挖之后再采用透水性较好的材料进行回填,对于地质条件为强风化花岗岩,会造成一定程度的浪费。在总结常规管井降水施工工艺的基础上,对常规管井降水技术进行改进,将管井周围土体直接作为透水性材料,通过高压风自动形成反滤层,形成新的降水技术,新技术减少了过滤层包裹和反滤层回填2 道工序。将该降水技术应用于厦门地铁4 号线暗挖隧道施工中,通过测算,单孔可节约过滤料 2. 92 m3,节约施工时间10 h 左右,同时对周围环境污染较小,环保效果突出。

关键词: 隧道, 暗挖法, 常规管井, 改进型管井, 降水, 风化花岗岩层, 过滤层

Abstract:

In order to guarantee the stability of excavation surface of mined tunnel, dewatering should be carried out before excavation. The filter layer used in conventional tube well dewatering technology is backfilled by permeable materials after excavation, which would lead to waste for weathered granite. As a result, the conventional tube well dewatering technology is improved. The soil around the tube well is directly used as the permeable materials, and the inverted filter is formed automatically by high-pressure wind, forming a new dewatering technology, which reduces the processes of filter layer wrapping and filter layer backfilling. The dewatering technology is applied to the underground tunnel construction of Xiamen Metro Line 4. According to the calculation results, 2. 92 m3 per hole of filter material can be saved and about 10 h of construction time can be reduced. The pollution to the surrounding environment is small and the environmental protection effect is outstanding as well.

Key words: tunnel, mining method, conventional tube well, improved tube well, dewatering, weathered granite stratum, filter layer

中图分类号: