• CSCD核心中文核心科技核心
  • RCCSE(A+)公路运输高质量期刊T1
  • Ei CompendexScopusWJCI
  • EBSCOPж(AJ)JST
二维码

隧道建设(中英文) ›› 2026, Vol. 46 ›› Issue (10): 2293-2306.DOI: 10.3973/j.issn.2096-4498.2026.10.018

• 典型工程 • 上一篇    下一篇

Intelligent Construction System and Key Innovations for Steel-Shell Concrete Composite Immersed Tunnel of Shenzhen-Zhongshan Link(深中通道钢壳混凝土组合结构沉管隧道智能建造技术与创新)

宋神友   

  1. (广东省公路建设有限公司, 广东 广州 510623)
  • 出版日期:2026-10-20 发布日期:2026-10-20
  • 作者简介:宋神友(1974—),男,湖北黄冈人,2023年毕业于清华大学,土木水利专业,博士,正高级工程师,现从事桥梁与沉管隧道建设管理与研究工作。E-mail: 180419969@qq.com。

Intelligent Construction System and Key Innovations for Steel-Shell Concrete Composite Immersed Tunnel of Shenzhen-Zhongshan Link

SONG Shenyou   

  1. (Guangdong Provincial Highway Construction Co., Ltd., Guangzhou 510623, Guangdong, China)
  • Online:2026-10-20 Published:2026-10-20

摘要: 深中通道钢壳混凝土沉管隧道建设初期面临产业链技术空白与传统工艺瓶颈,需突破超宽、深埋、变宽沉管隧道在结构理论、智能装备、工艺体系等方面的世界级难题,形成可复制推广的智能建造中国方案。方法上,创新性地提出“桥-岛-隧-水下互通”四位一体工程方案,并围绕该方案系统开展结构理论创新、智能装备研发与工艺体系构建: 揭示钢壳混凝土组合结构受力机理,建立双向强化抗弯与三机制抗剪设计方法; 研发“四线一系统”钢壳智能制造基地、高稳健自密实混凝土制备技术及世界首套智能浇筑装备; 国际首次研制浮运安装一体船,首创整体浮运管内推出式最终接头智慧合龙技术; 同时构建全流程电子档案全域管理体系。结果表明: 1)新结构使承载能力提高30%、断面高度降低16%、疏浚量减少1 500万m3; 2)实测混凝土与钢结构脱空量小于5 mm的脱空率不大于0.05%,实现了“1月1节”高工效预制; 3)浮运安装一体船与智慧安装技术解决了超宽超重管节长距离浮运与毫米级对接难题; 4)最终接头技术节省工期3个月,节省造价约2.4亿元。深中通道全面实现了外海钢壳混凝土沉管隧道智能化建造,为后续类似超大型跨海集群工程提供了完整的技术借鉴与示范。

关键词: 深中通道, 沉管隧道, 钢壳混凝土管节, 智能建造, 浮运安装, 最终接头

Abstract: At the beginning of steel-shell concrete immersed tunnel project of the Shenzhen-Zhongshan Link, the technical gaps in the industrial chain and the bottlenecks of traditional processes were encountered. The goal was to overcome world-class challenges in structural theory, intelligent equipment, and process systems for extra-wide, deep-buried, and variable-width immersed tunnels, and to develop a replicable and promotable Chinese solution for intelligent construction. An innovative “bridge-island-tunnel-underwater interchange” four-in-one engineering scheme was proposed. Based on this scheme, systematic research was conducted on structural theory innovation, intelligent equipment development, and process system construction. The load-bearing mechanism of the steel-shell concrete composite structure was revealed. A bidirectional strengthening flexural design method and a three-mechanism shear design method were established. A “four lines and one system” intelligent manufacturing base was built for steel shells. High-stability self-compacting concrete preparation technology and the world’s first intelligent pouring equipment were developed. The world’s first integrated floating transport and installation vessel was developed. An in-tube push-out final joint smart closure technology was created. A full-process electronic archive management system was also established. The results show that the new structure increased the bearing capacity by 30%, reduced the section height by 16%, and cut the dredging volume by 15 million m3. The measured void ratio with a steel-concrete interface gap of less than 5 mm was no more than 0.05%. A high-efficiency prefabrication goal of “one section per month” was achieved. The integrated vessel and smart installation technology solved the problems of long-distance floating transport and millimeter-level docking of extra-wide and ultra-heavy tunnel elements. The final joint technology saved three months of construction time and about 240 million yuan in costs. The conclusions are as follows: The Shenzhen-Zhongshan Link has fully achieved intelligent construction of offshore steel-shell concrete immersed tunnels, overcome the gaps in the entire industrial chain and technical bottlenecks, and provided complete technical references and demonstrations for subsequent similar super-large cross-sea cluster projects.

Key words: Shenzhen-Zhongshan Link, immersed tunnel, steel-shell concrete tunnel element, intelligent construction, floating transport and installation, final joint