• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2010, Vol. 30 ›› Issue (S1): 109-112.

• 研究与探索 • 上一篇    下一篇

地铁盾构隧道弯矩和变形控制值研究

刘庭金   

  1. 华南理工大学土木工程系,亚热带建筑科学国家重点实验室,广州510640
  • 收稿日期:2010-03-31 修回日期:2010-04-30 出版日期:2010-08-14 发布日期:2010-08-25
  • 作者简介:刘庭金(1976—),男,江西南康人,2004年毕业于同济大学结构工程专业,博士,副教授,主要从事岩土工程与地下结构方面的研究。

Study on Control Values of Bending Moment and Deformation
of Shieldbored Metro Tunnels

LIU  Ting-Jin   

  1. State Key Laboratory of Subtropical Building Science, Department of Civil Engineering, South China University
    of Technology, Guangzhou 510640
  • Received:2010-03-31 Revised:2010-04-30 Online:2010-08-14 Published:2010-08-25

摘要:

为评估紧邻基坑施工对地铁盾构隧道结构安全和运营安全的影响,需确定盾构隧道结构的弯矩和变形控制值。以广州地铁一号线黄沙车站地铁上盖基坑工程为背景,首先,根据盾构管片尺寸、配筋和接头螺栓情况,计算盾构隧道管片的弯矩控制值,评估依托工程盾构隧道结构的应力水平;其次,通过等效轴向刚度模型理论和简易接缝张开量计算方法,分析盾构隧道纵向变形曲率与管片环缝接头张开量的关系;然后,结合地铁盾构隧道保护经验和管片环模型试验结果,提出盾构隧道变形的控制值;最后,通过依托工程地铁盾构隧道结构的三维变形实测数据分析,评估目前盾构隧道结构的安全现状,并对隧道变形的监测工作提出建议。研究成果可为今后类似工程地铁盾构隧道的安全保护提供指导。

关键词: 隧道工程, 盾构隧道, 弯矩, 变形, 控制值, 接缝张开量, 安全评估, 数据分析

Abstract:

he safety of the shieldbored tunnel structures is jeopardized because the construction of the adjacent deep foundation pits affects the bending moment and deformation of the shieldbored tunnels. In order to evaluate and protect the shieldbored Metro tunnels, it is necessary to study the control values of the bending moments and deformations of the tunnels. Huangsha~Changshou Road tunnel on line 1 of Guangzhou Metro is taken as engineering example in the paper. First, the control value of the bending moment of the segment lining of the shieldbored tunnel is calculated and the stress on the shieldbored tunnel structure is evaluated on basis of the dimension, rebar arrangement and joint bolts of the segment ling; secondly, the relationships between the longitudinal deformation curvature of the tunnel and the circumferential joint openings of the segment lining is analyzed by using an equivalent axial rigidity model for shieldbored tunnels and a simple calculation method for the segment joint openings; thirdly, control values are recommended for the deformation of the shieldbored tunnel on basis of the shieldbored Metro tunnel protection experience and segment ring model test results; finally, the safety of the studied tunnel is evaluated and suggestions are made on the monitoring of the tunnel deformation on basis of the 3D deformation monitoring results of the tunnel. The study can be used as guidance for the protection of other shieldbored Metro tunnels affected by construction of adjacent underground works in the future.

Key words: tunnel, shieldbored tunnel, bending moment, deformation, control value, joint opening, safety evaluation, data analysis