隧道建设(中英文) ›› 2015, Vol. 35 ›› Issue (8): 787-791.DOI: 10.3973/j.issn.1672-741X.2015.08.007

• 研究与探索 • 上一篇    下一篇

岩堆体隧道洞口浅埋段开挖进尺的计算与分析--以云南麻昭高速公路赵家屋隧道为例

石先火1, 戴远全2, 郭建强1   

  1. 1. 中国铁建大桥局集团有限公司, 天津 300300 2. 中铁十六局集团有限公司, 北京 100018
  • 收稿日期:2015-02-09 修回日期:2015-04-13 出版日期:2015-08-20 发布日期:2015-08-24
  • 作者简介:石先火(1978-),男,安徽安庆人,2001年毕业于东北大学,土木工程专业,本科,高级工程师,主要从事隧道与地下工程施工管理工作。
  • 基金资助:

    云南省交通运输厅科技计划项目(KKK0201406045)

Calculation and Analysis on Excavation Cycle Length of Shallow Portal Sections of Tunnels Located in Talus Deposits: Case Study on  Zhaojiawu Tunnel on MaZhao Highway in Yunnan, China

SHI Xianhuo1, DAI Yuanquan2, GUO Jianqiang1   

  1. (1. China Railway Construction Bridge Engineering Bureau Group Co., Ltd., Tianjin 300300, China;  2. China Railway 16th Bureau Group Co., Ltd., Beijing 100018, China)
  • Received:2015-02-09 Revised:2015-04-13 Online:2015-08-20 Published:2015-08-24

摘要:

为了解决岩堆体隧道施工经验缺乏和开挖进尺选择随意性的问题,结合云南麻昭高速公路赵家屋岩堆体隧道工程实例,基于筒仓理论,提出了岩堆体隧道洞口浅埋段开挖进尺的计算公式,分析了核心土留设长度和不同岩堆体力学参数条件下的合理开挖进尺。结果表明: 岩堆体隧道施工中,若不采取预支护或预加固措施,各开挖进尺下隧道掌子面安全系数均较小,掌子面存在失稳风险;留设核心土能明显提高隧道掌子面的稳定性;开挖进尺对围岩黏聚力敏感,这对岩堆体隧道稳定性不利。

关键词: 岩堆体, 浅埋隧道, 开挖进尺, 极限分析方法, 掌子面稳定性

Abstract:

At present, there is lack of experience in the construction of tunnels located in talus deposits and it is random to choose the excavation cycle length for tunnels located in talus deposits. The entrance portal section and exit portal section of Zhaojiawu tunnel on MaZhao highway in Yunnan, China are located in talus deposits. In the paper, the calculation formulas for the excavation cycle length of the shallow portal section of Zhaojiawu tunnel are proposed on basis of silo theory, and the appropriate excavation cycle length of the portal section in talus deposits under the condition of different core soil lengths and different mechanical parameters of the talus deposits are analyzed. Conclusions drawn are as follows: 1) Whatever the excavation cycle length is, during the construction of tunnels located in talus deposits, the safety coefficient of the tunnel face is small and the tunnel face may lose its stability if no advance support or reinforcement measures are taken; 2) Core soil kept can improve the stability of the tunnel face significantly; 3) The excavation cycle length is sensitive to the cohesion of the surrounding rock, which is unfavorable for the stability of the tunnels located in talus deposits. 

Key words: talus deposit, shallow tunnel, excavation cycle length, ultimate analysis method, stability of tunnel face