ISSN 2096-4498 CN 44-1745/U
隧道建设(中英文) ›› 2016, Vol. 36 ›› Issue (1): 66-70.DOI: 10.3973/j.issn.1672-741X.2016.01.010
• 规划与设计 • 上一篇 下一篇
帅六妹, 李国清
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
SHUAI Liumei, LI Guoqing
Received:
Revised:
Online:
Published:
摘要:
对修建较早的车站未预留换乘节点,研究新建车站与未预留换乘节点的车站进行换乘方案设计的合理性。以北京地铁6号线一期工程车公庄站为例,通过对车公庄站与既有2号线车公庄站的换乘方案、换乘方式进行总结和分析,同时总结新建线路与建设较早的未预留换乘节点车站的几种换乘方式,如“十”、“T”型方式换乘; 实践证明采取“T”型换乘,新建车站下穿既有车站,设置3条换乘通道,实现单向换乘的方式较合理。为今后类似工程的换乘车站进行换乘设计提供指导和借鉴。
关键词: 地铁, 未预留换乘节点, 既有站, 换乘站, 换乘方式, 车公庄站
Abstract:
In this paper, the transfer scheme between Chegongzhuang Station of Beijing Metro and existing Metro station with no reserved transfer node is proposed. The transfer modes, i.e. crossshaped and Tshaped transfer modes, are summarized. It proves that the Tshaped transfer mode with 3 transfer galleries is optimum for a new Metro station undercrossing existing Metro station.
Key words: Metro, no reserved transfer node, existing Metro station, transfer station, transfer mode, Chegongzhuang Station of Beijing Metro
中图分类号:
U 452.2
帅六妹, 李国清. 未预留换乘节点的车站换乘方案研究——以北京地铁车公庄站为例[J]. 隧道建设, 2016, 36(1): 66-70.
SHUAI Liumei, LI Guoqing. Transfer Scheme with No Roreserved Node:  A Case Study on Chegongzhuang Station of Beijing Metro[J]. Tunnel Construction, 2016, 36(1): 66-70.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/10.3973/j.issn.1672-741X.2016.01.010
http://www.suidaojs.com/CN/Y2016/V36/I1/66