粉细砂地层单层暗挖车站工法比选研究

牛斌, 韩聪聪, 郭婷, 曾德光   

  1. (北京城建设计发展集团股份有限公司, 北京 100037
  • 出版日期:2020-08-30 发布日期:2020-09-15
  • 作者简介:牛斌(1987—),男,安徽阜阳人,2011年毕业于西南交通大学,桥梁与隧道工程专业,硕士,高级工程师,现从事城市轨道交通的设计与研究工作。E-mail: 420806180@qq.com。
  • 基金资助:

    石家庄地铁综合施工技术科研项目(GDJT-ZGB-FW008)

Comparison and Selection of Construction Methods for Singlelayer Mined Station in Silty Sand Stratum

NIU Bin, HAN Congcong, GUO Ting, ZENG Deguang   

  1. (Beijing Urban Construction Design & Development Group Co., Limited, Beijing 100037, China)
  • Online:2020-08-30 Published:2020-09-15

摘要: 为研究粉细砂地层单层暗挖车站柱洞法施工时地表沉降规律,采用注浆试验、数值分析与现场监控量测相结合的方式进行研究,并通过分析柱洞法在粉细砂地层设计及施工中存在的问题,提出一种在粉细砂地层单层暗挖车站的优化设计方案。结果表明: 1)注浆加固对粉细砂的含水量、黏聚力、内摩擦角、压缩模量均有明显的改善; 2)粉细砂地层柱洞法施工地表沉降大、沉降槽宽度大; 3)柱洞法施工时存在施工空间狭小、边跨施工沉降量大、综合接地施工困难等问题; 4)优化后的单层暗挖施工方案具有沉降量小、可机械化施工、节约工期、施工方便等优点。

关键词: 暗挖车站, 柱洞法, 粉细砂地层, 注浆试验, 数值分析, 监测

Abstract: In order to study the ground settlement law during the construction of the singlelayer mined station in silty sand layer by columnhole method, the method of grouting test, numerical analysis and onsite monitoring and measurement are combined and adopted. The problems in design and construction of columnhole method in silty sand layer are analyzed, and an optimized design method is put forward. The results show that: (1) The grouting reinforcement can significantly improve the moisture content, cohesion, internal friction angle and compression modulus of silty sand layer. (2) The ground settlement and settlement groove induced by columnhole method are large in silty sand layer. (3) Problems such as narrow construction space, large sidespan construction settlement, and difficulty in comprehensive grounding construction exist in columnhole method construction. (4) The optimized singlelayer mining construction scheme are characterized by small settlement, mechanized construction, time saving and convenient construction.

Key words: mined station, columnhole method, silty sand, grouting test, numerical simulation, monitoring

中图分类号: