隧道建设(中英文) ›› 2022, Vol. 42 ›› Issue (S1): 353-359.DOI: 10.3973/j.issn.2096-4498.2022.S1.040

• 规划与设计 • 上一篇    下一篇

富水断层破碎带大断面隧道设计与快速施工

吴金刚1, 2, 陈建芹3, 马杰1, 宋艳彬1, 周长林1, 郭淞1, 孙烨1   

  1. (1. 北京市市政工程设计研究总院有限公司, 北京 100082 2. 北京交通大学, 北京 100044; 3. 中铁隧道勘察设计研究院有限公司, 广东 广州 511457)

  • 出版日期:2022-07-22 发布日期:2022-08-23
  • 作者简介:吴金刚(1982—),男,山东滨州人,2007年毕业于北京交通大学,岩土工程专业,硕士,教授级高级工程师,现从事隧道及地下工程设计与研究工作。E-mail: 17717434@qq.com。

Design and Fast Construction Technology for LargeCrossSection Tunnel in WaterRich Fracture Zone

WU Jingang1, 2, CHEN Jianqin3, MA Jie1, SONG Yanbin1, ZHOU Changlin1, GUO Song1, SUN Ye1   

  1. (1. Beijing General Municipal Engineering Design and Research Institute, Beijing 100082, China; 2. Beijing Jiaotong 〖JP3University, Beijing 100044, China; 3. China Railway Tunnel Consultants Co., Ltd., Guangzhou 511457, Guangdong, China)
  • Online:2022-07-22 Published:2022-08-23

摘要: 为解决石峡隧道穿越F7断层及其次生断层影响带、实现快速施工满足通车工期要求的目的,通过数值计算、现场监测等手段,对超前支护、初期支护、锁脚锚杆措施进行了优化,优化措施在工程应用中取得了良好的效果。实践证明: 自进式管棚集钻进、注浆、支护于一体,增强了围岩的稳定性并大幅提高了超前支护施作效率;管棚保护下的两台阶快速开挖方法可实现初期支护的早封闭、少扰动,大幅提高了施工进度;不同角度、长度锁脚锚杆对拱顶沉降、周边收敛的影响规律,应结合围岩与衬砌变形规律选取合理的设计参数;管棚保护下的两台阶快速开挖方法及R51锁脚锚杆有效控制了围岩稳定和初期支护变形。

关键词: 公路隧道, 富水断层破碎带, 大跨隧道设计, 快速化施工, 自进式管棚, 突水突泥

Abstract: To successfully cross F7 fault and related secondary fracture zones and realize fast construction of Shixia tunnel, the advance support, primary support, and foot locking anchor bolt are optimized through numerical calculation and field monitoring methods. The recommended measures have achieved good results in engineering application. The practical results reveal the following: (1) The selfpropelled pipe shed integrates drilling, grouting, and support, which enhances the stability of surrounding rock and greatly improves the construction efficiency of advance support. (2) The twobench rapid excavation method under the protection of pipe shed can realize early closure and less disturbance of primary support, and greatly improve the construction progress. (3) The influence law of various angles and lengths of foot locking anchor bolt on crown settlement and peripheral convergence vary, hence, reasonable design parameters should be selected according to the deformation law of surrounding rock and lining. (4) The twobench rapid excavation method under the protection of pipe shed and R51 foot locking anchor bolt can effectively control the stability of surrounding rock and the deformation of primary support.

Key words: highway tunnel, waterrich fracture zone, largespan tunnel design, fast construction, selfpropelled pipe shed, water and mud inrush