隧道建设(中英文) ›› 2025, Vol. 45 ›› Issue (S1): 217-225.DOI: 10.3973/j.issn.2096-4498.2025.S1.022

• 规划与设计 • 上一篇    下一篇

地铁地下一层侧式站的创新设计及连带问题研究——以苏州地铁8号线园区火车站为例

邓绍军   

  1. (中铁第四勘察设计院集团有限公司, 湖北 武汉 430063
  • 出版日期:2025-07-15 发布日期:2025-07-15
  • 作者简介:邓绍军(1991—),男,湖南常德人,2018年毕业于华中科技大学,建筑学专业,硕士,工程师,现从事轨道交通及地下空间设计与研究工作。E-mail: 815594059@qq.com。

Innovative Design of Side Platform Stations on Underground First Floor of Metros and Associated Issues: A Case Study of Industrial Park Railway Station of Suzhou Metro Line 8

DENG Shaojun   

  1. (China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China)
  • Online:2025-07-15 Published:2025-07-15

摘要: 为解决地铁地下一层侧式站站台易产生狭长空间导致空间压抑、轨顶风道和全高屏蔽门限制大空间营造的问题,提出3项创新设计: 1)扩大站台与站厅空间连通,减少站台狭长空间; 2)取消轨顶风道和全高屏蔽门,营造大空间; 3)设置弧形采光天窗,适度抬高局部室内空间。同时,对由创新设计产生的连带问题,提出相应的解决措施。例如: 取消8号线车站设防,保留3号线车站设防功能等措施,来解决设置天窗后难以设防的问题; 通过加强防火分隔措施和火灾荷载控制、调整隧道防排烟方案、加强车站防排烟等措施来解决取消轨道风道和全高屏蔽门后,公共区防火分区超5 000 m2、车站公共区和轨行区结合防排烟的问题。最后,通过疏散及烟气模拟分析,验证设计方案的安全性和可靠性。这些创新措施已在苏州地铁8号线园区火车站项目中得到应用。应用结果表明: 这些创新设计的实施可以有效改善站台狭长空间的压抑感,创造视野通透、空间开阔且舒适的室内环境,显著提升站内环境品质和乘客的出行体验。

关键词: 地铁, 地下一层侧式站, 狭长空间, 大空间

Abstract:

Side platform stations on the metro underground first floor easily cause confined and oppressive spaces, and the track-top wind ducts and full-height platform screen doors restrict large space construction. To address these issues, three innovative design proposals are introduced: (1) The connection between the platform and the hall is enlarged to reduce elongated platform space. (2) Track-top wind ducts and full-height platform screen doors are removed to create a larger space. (3) Curved skylights are installed to moderately elevate local indoor spaces. Additionally, corresponding solutions are proposed for the associated issues arising from these innovative designs. For instance, the security measures at Line 8 stations are removed while retaining the security functions at Line 3 stations to address the difficulty in securing areas with skylights. After removing the track-top wind ducts and full-height platform screen doors, the fire compartments in the station public area exceed 5 000 m2, and the smoke can be extracted from public area and track zone. To address these issues, measures such as strengthening fire separation and controlling fire loads, adjusting the tunnel smoke extraction plans, and enhancing station smoke extraction are implemented. Furthermore, the safety and reliability of the design scheme is validated through evacuation and smoke simulation analyses. These innovative measures have been applied in the Industrial Park station of the Suzhou metro line 8. The applicable results indicate that the implementation of these innovative designs effectively alleviate the oppressive feeling brought by elongated platform spaces, creating a transparent, open, and comfortable indoor environment, which significantly enhances the quality of the station environment and the travel experience of passengers.

Key words: metro, side platform station on underground first floor, elongated space, large space