- 中国科学引文数据库(CSCD)来源期刊
- 中文核心期刊中文科技核心期刊
- Scopus RCCSE中国核心学术期刊
- 美国EBSCO数据库 俄罗斯《文摘杂志》
- 《日本科学技术振兴机构数据库(中国)》
隧道建设(中英文) ›› 2007, Vol. 27 ›› Issue (6): 36-38.DOI: B
苏利军, 刘立新
SU Li-Jun, Liu-Li-Xin
摘要:
Due to the rigorous time limit of drain tunnel in JinpingII Hydropower Project, compact plane layout that can satisfy the requirements of quick TBM assemble is designed for the TBM assemble cavern, minimal crosssection that can satisfy the assemble is designed, reinforcement pattern consisting of rock bolts, shotcreting and wire meshing is designed. The design plan of the TBM assemble cavern is favorable for the ontime boring the TBM.
中图分类号: