Tunnel Construction ›› 2012, Vol. 32 ›› Issue (3): 323-327.DOI: 10.3973/j.issn.1672-741X.2012.03.010
• wenzhang • Previous Articles Next Articles
LIU Peng1, LIU Wei2
Received:
Revised:
Online:
Published:
Abstract: In the construction of overlapping tunnels in waterrich strata, the ground deformation induced by stress releasing and water seepage has adverse impact on the tunnel structure and the surrounding buildings. The ground deformation rules are analyzed, with the construction of a mined overlapping tunnel of Shenzhen Metro as an example. The results show that: 1) The lower tunnel should be built before the upper tunnel, which is favorable for the stability of the tunnel structure; 2) The main causes for the ground deformation are the ground water seepage and stress releasing occurring after tunnel excavation.
Key words: overlapping tunnel, waterrich strata, monitoring, ground deformation
LIU Peng, LIU Wei. Analysis on Deformation of Tunnel Structure and Ground Induced by Construction of Overlapping Tunnels in Waterrich Strata[J]. Tunnel Construction, 2012, 32(3): 323-327.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.03.010
http://www.suidaojs.com/EN/Y2012/V32/I3/323
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine