[1] |
LI Shenkui.
Numerical Analysis and Model Test of Hourglassshaped
Karst Collapse in Wuhan Area
[J]. Tunnel Construction, 2020, 40(7): 981-987.
|
[2] |
LUO Duhao, JIANG Si, LIU Jianyou.
Improvement Technology of Bearing Capacity of
Prestressed Anchor Cable in
Large span Tunnel: a Case Study on Badaling Great Wall Station
[J]. Tunnel Construction, 2020, 40(6): 873-879.
|
[3] |
FANG Zhongyu.
Design and Application of Online Temperature Monitoring System for
Cutterhead of Large-diameter Slurry Shield under Atmospheric Pressure:
a Case Study on Wangjiang Road River-crossing Tunnel Project in Hangzhou
[J]. Tunnel Construction, 2020, 40(4): 586-590.
|
[4] |
FU Zhiqian, DUAN Ruyu, NIE Dafeng, HUA Yang, DONG Yucang.
Cavity Laws and Structural Stress Characteristics of Tunnel Bottom
Surrounding Rock under Different Soil Surrounding Rock Conditions
[J]. Tunnel Construction, 2020, 40(3): 306-315.
|
[5] |
SUI Hongrui, ZHOU Jinzhong, HE Weiguo.
Upgrading and Improvement of Insulation Measures for FoamWater Spray System of Haihe Tunnel in Tianjin
[J]. Tunnel Construction, 2020, 40(2): 283-291.
|
[6] |
MA Xiangfeng, GONG Lun, ZHANG Zhixin, QIU Wenge, WANG Lichuan, ZHOU Shangjin.
Study on Tunnel Stress and Load-bearing Arch Effect during Excavation and Filling
[J]. Tunnel Construction, 2019, 39(S2): 185-191.
|
[7] |
YANG Bo, TAN Yong.
Model Test Study on Influences of Deep Foundation Pit on Adjacent Tunnel in Soil-Rock Mixtures
[J]. Tunnel Construction, 2019, 39(S2): 192-199.
|
[8] |
WANG Zhijie, TANG Li, JIANG Xinzheng, HOU Weiming, XU Haiyan, JI Xiaofeng.
Model Test on Stability of Large Crosssection Highway Tunnel Adjacent to Caverns
[J]. Tunnel Construction, 2019, 39(S1): 16-24.
|
[9] |
CHEN Xiaojian.
Similar Model Test Study of Longitudinal Differential Settlement of Shield Tunnel in Softhard Uneven Strata
[J]. Tunnel Construction, 2019, 39(S1): 57-64.
|
[10] |
CAO Zhengmao, ZHANG Qi, CHEN Jianzhong.
Experimental Study of Field Fire Test of Full Jet Longitudinal Smoke Exhaust in a 6km Highway Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 94-100.
|
[11] |
DAI Miaoxian, ZHANG Tianhang, YIN Mingjian, LUO Chunhou, WU Kaijie, HOU Yunge, WU Ke.
Jet Flow Ventilation Characteristics and Air Flow Scheme for Underground Traffic Turning Platform
[J]. Tunnel Construction, 2019, 39(S1): 139-145.
|
[12] |
ZHANG Zixin, GU Guansi, HUANG Xin, ZHANG Jiaqi, ZHANG Chi.
Experimental Study on Waterproof Performance of Embedded Sealing Gasket of Segment Joint For a Shield Tunnel
[J]. Tunnel Construction, 2019, 39(9): 1402-1411.
|
[13] |
DAI Cong, HE Chuan, LIU Chuankun, GUO Wenqi.
Influence of Pipe Roof Layout Range on Stability of Surrounding Rock of Soft Rock Tunnel
[J]. Tunnel Construction, 2019, 39(9): 1437-1444.
|
[14] |
ZHU Yaohong, GAO Yimin, DONG Zibo, LIU Xian.
Field Test on Structural Mechanism of Tconnected Shield Tunnel:a Case Study of Connecting Passage on Ningbo Metro Line No. 3
[J]. Tunnel Construction, 2019, 39(11): 1759-.
|
[15] |
QIN Yinping, ZHANG Zhuqing, SUN Zhenchuan, CHEN Kui, YANG Yandong.
Analysis and Prediction of TBM Disc Cutter Wear Based on Field Test
[J]. Tunnel Construction, 2019, 39(11): 1914-.
|