[1] |
HAN Xianmin, XIAO Mingqing, LI Wenjiang, ZHU Yongquan.
Influence of Multipipe Jacking of Pipe CurtainStructure Method on Settlement of Platform and Track of Railway Station
[J]. Tunnel Construction, 2020, 40(2): 170-178.
|
[2] |
JIANG Guojing, LI Fangzheng, ZHOU Xiaomin.
Application of Inclinometer Technology of Fiber Optic Gyroscope with Near-Horizontal Freezing Hole
[J]. Tunnel Construction, 2020, 40(1): 114-119.
|
[3] |
XU Jinbin, WANG Feng, FU Cong, SONG Wei.
Combined Application of Cement System and Vertical Ground Freezing to Shield Receiving in Wuhan Metro
[J]. Tunnel Construction, 2019, 39(S2): 358-365.
|
[4] |
ZHANG Junru, YAN Congwen, YE Lun, WANG Anhui, ZHAO Zijing, FENG Jimeng.
Analysis of Mechanical Effect of Box Culvert Jacking on Bottom Pipe Curtain
[J]. Tunnel Construction, 2019, 39(S1): 73-79.
|
[5] |
XIONG Haoxiang, REN Hui, WENG Yuanlin.
Analysis of Construction Organization Scheme of Fivebench Fourteenstep Excavation Applied to Gongbei Tunnel
[J]. Tunnel Construction, 2019, 39(2): 281-286.
|
[6] |
MA Jun, HU Daoyun, YANG Ping.
Horizontal Freezing and Measurement Analysis of Plane Oblique Connection Gallery
[J]. Tunnel Construction, 2019, 39(12): 1965-.
|
[7] |
NIU Jie .
Application of Micro-disturbance Propulsion Construction Technology for Large Cross-section Box Culvert
[J]. Tunnel Construction, 2019, 39(11): 1905-.
|
[8] |
CHEN Song.
Combined Application of Rodin Jet Pile Method and Freezing Method to Shield Receiving End Soil
[J]. Tunnel Construction, 2018, 38(6): 1037-1043.
|
[9] |
DIAO Pengcheng, YANG Ping.
Application and Measurement of Secondary Consolidation by Liquid Nitrogen Freezing to Small Shield Receiving in Waterrich and Softweak Strata
[J]. Tunnel Construction, 2018, 38(6): 1044-1051.
|
[10] |
ZHANG Jie SHI Peixin, PAN Jianli.
Study of Ground Frost Heave Control Technology Used in Gongbei Tunnel Constructed by Pipe Roof and Ground Freezing Method
[J]. Tunnel Construction, 2018, 38(5): 809-817.
|
[11] |
YANG Xiaoping, LIN Peiqin, CONG Zhu, LIU Tingjin.
Numerical and Theoretical Analysis of Freezinginduced Water Leakage of Metro Shield Tunnel
[J]. Tunnel Construction, 2018, 38(2): 176-182.
|
[12] |
XU Liming, CHEN Xiaojian, PENG Zhengyong, ZHOU Jianjun.
Study of Health Monitoring Technology for Crosspassage in Subsea Tunnel Constructed by Freezing Method
[J]. Tunnel Construction, 2018, 38(2): 295-299.
|
[13] |
WU Zhen, GENG Chuanzheng, WANG Lei.
Underwater Receiving Technology of EPB Shield in Waterrich Gravel Stratum
[J]. Tunnel Construction, 2018, 38(12): 2040-2045.
|
[14] |
ZHAO Wen, DONG Jiachao, JIA Pengjiao, SHI Jianjun, XIAO Junhang, LIU Qiang.
Study of Construction Technology of Steel Tube Slab Structure for Mined Metro Station
[J]. Tunnel Construction, 2018, 38(1): 72-79.
|
[15] |
MA Yue, LIAO Fang, ZHU Zhiwu, YANG Liu.
Analysis of Freezing Process of Artificial Frozen Soil and Calculation of Spacing between Freezing Pipes
[J]. Tunnel Construction, 2017, 37(8): 1011-1017.
|