Abstract: There is great difficult in the accurate positioning of superdeep intermediate support columns of cutandcover Metro stations. A kind of appropriative positioning frame is established. Construction technologies, including using short boom to adjust long boom, using laser light to guide the direction and early inserting method, are adopted. A new kind of positioning technology for crosstype shapedsteel column is established, and the cost and the risk are reduced. The manufactory fabrication of heavy shapedsteel column is realized and doubletremie concrete casting technology is used. Rapid and safe construction is reached and the quality and economic benefits are guaranteed.
Key words: Wuxi Metro, crosstype shapedsteel column, early inserting method, short boom, adjusting, long boom, positioning technology
MENG Shuhong. Construction Technologies for Superdeep Intermediate Support Column of Cutandcover Metro Station[J]. Tunnel Construction, 2012, 32(6): 873-881.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.06.022
http://www.suidaojs.com/EN/Y2012/V32/I6/873