[1] |
ZHANG Tongsong.
Study on Scheme of Tshaped
Metro Transfer Station with Part Route
[J]. Tunnel Construction, 2020, 40(7): 1011-1016.
|
[2] |
WANG Ruochen, ZHU Yong, DI Cheng, HUANG Hua.
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou
Railway
[J]. Tunnel Construction, 2020, 40(7): 1029-1034.
|
[3] |
JIANG Lijie, WEN Yongliang, JIA Lianhui, CHEN Baozong, HE Fei.
Design and Analysis of a New TBM Propulsion System
with Small Turning Radius
[J]. Tunnel Construction, 2020, 40(7): 1081-1087.
|
[4] |
WANG Shoushuo, DU Zhigang, WEN Jingzhou, YANG Libo.
Study on Driver′s Visual Load in Lowgrade Highway Optical Long Tunnel
[J]. Tunnel Construction, 2020, 40(2): 209-214.
|
[5] |
SUI Hongrui, ZHOU Jinzhong, HE Weiguo.
Upgrading and Improvement of Insulation Measures for FoamWater Spray System of Haihe Tunnel in Tianjin
[J]. Tunnel Construction, 2020, 40(2): 283-291.
|
[6] |
ZHANG Junru, YAN Congwen, YE Lun, WANG Anhui, ZHAO Zijing, FENG Jimeng.
Analysis of Mechanical Effect of Box Culvert Jacking on Bottom Pipe Curtain
[J]. Tunnel Construction, 2019, 39(S1): 73-79.
|
[7] |
DING Xiaojun, LIU Yao, LEI Mingfeng.
Calculation of Bending Moment Bearing Capacity of Circular Reinforced Concrete Pile after Partial Excision and Its Application
[J]. Tunnel Construction, 2019, 39(S1): 88-93.
|
[8] |
XIONG Haoxiang, XU Qingshuang, REN Hui.
Investigation on Jacking Force Parameters of Curved Piperoofing Construction in Gongbei Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 146-151.
|
[9] |
LUO Yanping, HAN Jingke, WEN Zhan, LUO Yang, LIU Pu.
Optimization of Ventilation Scheme of Jinjiazhuang Extralong Spiral Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 385-391.
|
[10] |
LIANG Xiaoliang, SHI Qingneng, DENG Lin, TANG Yong, LIU Shouhua, YANG Junsheng.
Comparison and Selection of Construction Schemes for Interchange Node under Existing Operating Metro Stations
[J]. Tunnel Construction, 2019, 39(S1): 369-376.
|
[11] |
WANG Ning, GAO Yi, YU Shaohui, LI Yang.
Disturbance of Rectangular Pipe Jacking Tunnel Group Construction on Soil Behind Working Shaft
[J]. Tunnel Construction, 2019, 39(3): 413-420.
|
[12] |
WANG Kai, SUN Zhenchuan, NIU Zilong, WANG Guoan, LI Fengyuan, ZHANG Bing.
Analysis and Calculation on Thrust Force and Torque of Extra-large Diameter Slurry Shield in Soft Soil
[J]. Tunnel Construction, 2019, 39(12): 2074-.
|
[13] |
TIAN Feng, WANG Haiqiao, ZHU Zhulong, CHEN Shiqiang, HUANG Junxin.
Study and Application of Algorithm of Available Safety Evacuation Time in Long Subsea Metro Tunnel
[J]. Tunnel Construction, 2019, 39(1): 54-59.
|
[14] |
HU Hui, LI Bingtian, QIU Wenge.
A Seismic Test Method for Simulating Dynamic Characteristics of Tunnel Crossing Seismogenic Fault
[J]. Tunnel Construction, 2018, 38(6): 948-953.
|
[15] |
GAO Jijin, HUANG Biao, ZHANG Wei, CHEN Jinjian.
Study of Calculation Method for Vertical Displacement of Crossed Tunnels under Surface Surcharge Loading
[J]. Tunnel Construction, 2018, 38(5): 818-823.
|