[1] |
HAN Yun.
Study on Treatment Technology of Water Gushing and Mud
Bursting Caused by Segment Drilling of Underwater Shield Tunnel
[J]. Tunnel Construction, 2020, 40(7): 1049-1056.
|
[2] |
SUN Haibo.
Key Technology of Main Drive Assembly and Inspection
Technology of Meshing Quality of Gear Pair during TBM Remanufacturing
[J]. Tunnel Construction, 2020, 40(6): 890-897.
|
[3] |
SUN Zhenchuan, LI Fengyuan, CHU Changhai.
Analysis Method of Correlation between Shield Tunneling and Geology Based on Big Data
[J]. Tunnel Construction, 2020, 40(2): 162-169.
|
[4] |
LIAO Jun, XIAO Bo, WANG Daoliang, SHI Bo.
Discussion on Some Issues in Prevention and Treatment Design for Tunnel Crossing Debris Flow Gully
[J]. Tunnel Construction, 2020, 40(1): 75-82.
|
[5] |
JIANG Guojing, LI Fangzheng, ZHOU Xiaomin.
Application of Inclinometer Technology of Fiber Optic Gyroscope with Near-Horizontal Freezing Hole
[J]. Tunnel Construction, 2020, 40(1): 114-119.
|
[6] |
DAI Zhiren, REN Jian, LI Xiaoqiang, WANG Tianming.
Technologies for Shield Tunnel Crossing Underneath Turnout Groups of Railway Turnout Area in Waterrich Sandy Cobble Stratum
[J]. Tunnel Construction, 2019, 39(6): 1005-1013.
|
[7] |
QIN Dongchen, ZHOU Peng.
Analysis of Sunk Volume in Shield Construction Process Based on Su AI Channel Project
[J]. Tunnel Construction, 2018, 38(S2): 7-15.
|
[8] |
XU Zan, XU Zhengshuai, CHEN Xianzhi, XU Xing, GU Zhanghe.
Research on Construction Support Scheme of Superstructure of Opencut Subway Station under the Condition of Shield Machine Driving through a Station
[J]. Tunnel Construction, 2018, 38(S2): 303-309.
|
[9] |
HUANG Tao, LIU Quansheng, HUANG Xing, ZHANG Xiaoping, LU Xinjing.
Research and Development of RealTime Monitoring System forScraper Wear and Laboratory Verification Experimental Test
[J]. Tunnel Construction, 2018, 38(S2): 364-373.
|
[10] |
ZHENG Yongguang, XUE Guangji, CHEN Jinbo, PANG Wenzhuo.
Development, Application and Prospect of Technology of Specialshaped Boring Machine in China
[J]. Tunnel Construction, 2018, 38(6): 1066-1078.
|
[11] |
JIN Ruohong, WANG Kangwei.
Discussion on Sensitivity of Circuit Breaker Protection of Longdistance Power Distribution Line in Tunnel
[J]. Tunnel Construction, 2018, 38(5): 753-756.
|
[12] |
YANG Yuan, WANG Chunsong.
Driving Control Technology for Active Articulated Shield Machine in Moderately Weathered Mudstone in Continuous Small Radius Curve
[J]. Tunnel Construction, 2017, 37(S1): 189-193.
|
[13] |
YANG Hao.
Optimal Layout of Monitoring Points for Tunnel Crown Settlement by Using Triangle Area Method
[J]. Tunnel Construction, 2016, 36(7): 868-871.
|
[14] |
LI Dongli, SUN Zhihong, REN Dezhi, SUN Wei.
Study of Application of Eddycurrent Sensor to Disccutter Wear Monitoring System of Shield Machines
[J]. Tunnel Construction, 2016, 36(6): 766-770.
|
[15] |
SUN Zhihong, LI Dongli, ZHANG Jianian.
Wireless Realtime Disc Cutter Wear Monitoring System for Composite Shield Machine
[J]. Tunnel Construction, 2016, 36(4): 485-489.
|