Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊2): 66-71.DOI: 10.3973/j.issn.1672-741X.2012.z2.013
Previous Articles Next Articles
WANG Huaidong1, PENG Hongxia2, QIN Wei1
Received:
Revised:
Online:
Published:
Abstract:
The construction of the cable tunnel underneath Qinhuai River of a transformer substation at dock is a great challenge,as a result of high water table,soft ground under riverbed,deep friction piles in embankment,restricted construction methods,embankment protection during tunneling and high requirement of tunnel drainage.Finally,shield machine was selected for the cable tunnel construction after an overall comparison of underwater tunnel construction methods and analysis of the influences of riverbed erosion and other factors on tunnel cover.In addition,pile foundation underpinning and grouting are proposed for embankment reinforcement before tunneling after analysis of embankment stability and safety;and a tunnel drainage scheme is draw up through comparison of practicability and safety,including single slope drainage and pumping station in launching shaft.The smooth construction of the cable tunnel shows that the selected construction method and embankment reinforcement measures are safe and reliable,and the tunnel drainage scheme is effective and practical.
Key words: shield tunnel, riverbed erosion, friction pile for embankment, pile foundation underpinning, tunnel drainage
WANG Huaidong, PENG Hongxia, QIN Wei. Discussions on the Key Construction Technologies for Cable Tunnel Underneath Qinhuai River[J]. Tunnel Construction, 2012, 32(增刊2): 66-71.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.z2.013
http://www.suidaojs.com/EN/Y2012/V32/I增刊2/66
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition