Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊2): 210-213.DOI: 10.3973/j.issn.1672-741X.2012.z2.041

Previous Articles     Next Articles

Monitoring Technology of BOTDR Distributed Optical Fiber: Case Study on Displacement of Bored Pile

YIN Long   

  1. (Technology Center of China Railway Tunnel Group Co. Ltd., Luoyang 471009, Henan, China)
  • Received:2012-08-16 Revised:2012-09-08 Online:2012-12-20 Published:2013-02-19

Abstract:

The routine monitoring have disadvantages, such as point type, low quality, low robotization, short monitoring distance, small monitoring area and low integration. BOTDR real time, long distance and distributed monitoring technology is used. The feasibility of the mentioned technology is proved.

Key words: bored pile, BORDR, distributed monitoring, progressiveness.