Treatments of Waste Slurry of Slurry Shield Machine

SU Qinggui, ZHAI Zhiguo, DENG Hengyi   

  1. (The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)
  • Received:2012-07-26 Revised:2012-09-10 Online:2012-12-20 Published:2013-02-19

Abstract:

The geological conditions of Beijing underground connecting line are analyzed, the slurry treatment equipments are modified on basis of different geological conditions and pressing and filtering system and centrifuging system are used, so as to protect the environment in urban areas. The paper can provide references for slurry treatment of similar projects in the future.

Key words: Beijing underground connecting line, slurry shield machine, waste slurry, environmental protection