[1] |
SUN Zhenchuan, LI Fengyuan, CHU Changhai.
Analysis Method of Correlation between Shield Tunneling and Geology Based on Big Data
[J]. Tunnel Construction, 2020, 40(2): 162-169.
|
[2] |
PENG Lei, HE Wenmin, CHANG Yawen, KONG Lingchang, YANG Jiangpeng, ZHU Peng.
Compressed Air Foam System and Its Foaming Performance
[J]. Tunnel Construction, 2019, 39(11): 1815-.
|
[3] |
QIN Dongchen, ZHOU Peng.
Analysis of Sunk Volume in Shield Construction Process Based on Su AI Channel Project
[J]. Tunnel Construction, 2018, 38(S2): 7-15.
|
[4] |
XU Zan, XU Zhengshuai, CHEN Xianzhi, XU Xing, GU Zhanghe.
Research on Construction Support Scheme of Superstructure of Opencut Subway Station under the Condition of Shield Machine Driving through a Station
[J]. Tunnel Construction, 2018, 38(S2): 303-309.
|
[5] |
HUANG Tao, LIU Quansheng, HUANG Xing, ZHANG Xiaoping, LU Xinjing.
Research and Development of RealTime Monitoring System forScraper Wear and Laboratory Verification Experimental Test
[J]. Tunnel Construction, 2018, 38(S2): 364-373.
|
[6] |
ZHENG Yongguang, XUE Guangji, CHEN Jinbo, PANG Wenzhuo.
Development, Application and Prospect of Technology of Specialshaped Boring Machine in China
[J]. Tunnel Construction, 2018, 38(6): 1066-1078.
|
[7] |
HAO Yongxing, LIU Yuyang, ZHOU Jianjun, ZHOU Yang, ZHENG Shujuan, LEI Chao.
Fault Diagnosis on Hydraulic Driving System of Shield Cutterhead Based on VariableWeightedPrincipalComponentAnalysis (VWPCA)
[J]. Tunnel Construction, 2018, 38(1): 118-123.
|
[8] |
YANG Yuan, WANG Chunsong.
Driving Control Technology for Active Articulated Shield Machine in Moderately Weathered Mudstone in Continuous Small Radius Curve
[J]. Tunnel Construction, 2017, 37(S1): 189-193.
|
[9] |
ZHANG Hua.
Application of Casting Layer by Layer and Window by Window and Grouting Through Mold to Tunnel Lining
[J]. Tunnel Construction, 2017, 37(12): 1607-1612.
|
[10] |
LI Dongli, SUN Zhihong, REN Dezhi, SUN Wei.
Study of Application of Eddycurrent Sensor to Disccutter Wear Monitoring System of Shield Machines
[J]. Tunnel Construction, 2016, 36(6): 766-770.
|
[11] |
SUN Zhihong, LI Dongli, ZHANG Jianian.
Wireless Realtime Disc Cutter Wear Monitoring System for Composite Shield Machine
[J]. Tunnel Construction, 2016, 36(4): 485-489.
|
[12] |
GUO Weishe.
Reflecting on Technologies for Shield Tunneling in Heterogeneous Ground
[J]. Tunnel Construction, 2016, 36(10): 1196-1201.
|
[13] |
LIU Jia, WU Dexing, GAO Xiang.
Study on Options of Guanmen Subsea Tunnel in Zhoushan
[J]. Tunnel Construction, 2015, 35(S2): 57-62.
|
[14] |
WANG Guozheng, WANG Guotao.
Development of Electrical Control System of Test Bench of Rock Breaking System of Tunnel Boring Machines
[J]. Tunnel Construction, 2015, 35(3): 279-284.
|
[15] |
CHEN Xiangsheng.
Several Key Points of Artificial Ground Freezing Method and Its Latest Application in China
[J]. Tunnel Construction, 2015, 35(12): 1243-1251.
|