ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2014, Vol. 34 ›› Issue (8): 778-783.DOI: 10.3973/j.issn.1672-741X.2014.08.012
Previous Articles Next Articles
JIA Guangwu
Received:
Revised:
Online:
Published:
Abstract:
The shieldbored running tunnel from Panda Avenue Station to Zoo Station of No. 5 bid section of Phase I project of Line 3 of Chengdu Metro crosses underneath Chuanshan interchange. The mentioned running tunnel is located in mudstone and clay ground, and the interchange above the running tunnel has strict requirement on the ground settlement. The following countermeasures are taken: 1) Special chemical ground conditioning agents are used to control the boring parameters; 2) For sections with high settlement control requirement, prereinforcement from the ground surface is executed before shield passes and reinforcement from inside the tunnel is executed after the shield passes. The construction practice shows that the countermeasures taken can bring the ground surface settlement under effective control and can ensure the safety of the tunneling and the normal operation of the interchange. The paper can provide reference for similar projects in the future.
Key words: Chengdu Metro, shieldbored tunnel, Chuanshan interchange, reinforcement, monitoring
CLC Number:
U 45
JIA Guangwu. Construction Technologies for Shieldbored Tunnel Crossing underneath Chuanshan Interchange[J]. Tunnel Construction, 2014, 34(8): 778-783.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.08.012
http://www.suidaojs.com/EN/Y2014/V34/I8/778
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine