ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2014, Vol. 34 ›› Issue (8): 771-777.DOI: 10.3973/j.issn.1672-741X.2014.08.011
Previous Articles Next Articles
DU Chuangdong
Received:
Revised:
Online:
Published:
Abstract:
In this article, the construction program of “oppositedirection boring, docking in ground, and dismantling in tunnel” used in Shiziyang shieldbored tunnel on GuangzhouShenzhenHong Kong passengerdedicated railway is presented, with special attention paid to “docking in ground”. Difficulties, such as high docking precision, large water inflow at docking face, and small space for shield dismantling, have been conquered by strengthening the process control of “docking in ground” and by taking assistant countermeasures. In the end, the shield docking has been successfully completed, and good effect has been achieved.
Key words: shieldbored tunnel, oppositedirection boring, docking in ground, dismantling in tunnel
CLC Number:
U 45
DU Chuangdong. Shield Docking Technologies for Shiziyang Tunnel[J]. Tunnel Construction, 2014, 34(8): 771-777.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.08.011
http://www.suidaojs.com/EN/Y2014/V34/I8/771