Study on Key Technologies of Large Diameter Tunnel Crossing underneath Yellow River

ZHOU LU, SUN Xiaoling   

  1. (China Railway Tunnel Survey & Design Institute Co., Ltd., Tianjin 300133, China)
  • Received:2013-02-21 Revised:2014-06-20 Online:2014-08-15 Published:2014-08-11

Abstract:

In this paper, 3 key construction technologies, including safe overburden thickness, influence on dike, and tunnel segment structure and connection waterproofing of large diameter tunnel crossing underneath Yellow river, are studied. Conclusions drawn are as follows: 1) Minimum buried depth of tunnel and the longitudinal alignment of the tunnel are obtained; 2) Influence on dike is checked; 3) Tunnel segments, segment joints and elastic gasket used for waterproofing of tunnel segments are designed, and the waterproof reliability of segment joints is checked.

Key words: large diameter shield machine, Yellow rivercrossing tunnel, buried depth, dike, waterproofing, tunnel segment