ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2015, Vol. 35 ›› Issue (3): 244-249.DOI: 10.3973/j.issn.1672-741X.2015.03.009

Previous Articles     Next Articles

Analysis on Influence of Cutting of Foundation Pit on Existing Structure:  Case Study on Cutting of a Tshaped Transfer Metro Station

LIU Liang   

  1. (China Railway Tunnel Survey & Design Institute Co., Ltd., Tianjin 300133, China)
  • Received:2014-11-12 Revised:2015-01-20 Online:2015-03-20 Published:2015-03-20

Abstract:

The cutting of the foundation pit of a Tshaped transfer Metro station will have unbalanced pressure on the existing Metro structure. In the paper, numerical analysis is made on the deformation of the existing Metro structure caused by the cutting of the foundation pit of a Tshaped transfer Metro station by means of Plaxis finite element program, so as to protect the existing Metro structure and to ensure that the deformation of the existing structure can meet the operation requirements. The study, which shows that open cutting can be adopted for the foundation pit of the Tshaped transfer Metro station, can provide theoretical reference for the construction drawing design in the following stage. Furthermore, a series of countermeasures are proposed for the cutting of the foundation pit and the dismantling of the existing structure.

Key words: Tshaped transfer Metro station, foundation pit cutting, deformation, numerical analysis, protection

CLC Number: