Due to the loose and instable property of artificiallyfilled soil strata, it is difficult to build mined tunnels in such strata. In the paper, the design of a 4arched tunnel of Beijing Metro located in artificiallyfilled soil strata is studied by means of theoretical analysis and finite element numerical simulation. Comparison and contrast is made among three construction methods, i.e., pilot method, side heading method and “pilot method + side heading method”, in terms of stress on the support structure, ground surface settlement, risk control and construction period. Conclusion is drawn that the side heading method is the optimum construction method for the project. The proposed method has been adopted for the project, which shows that the method can minimize the horizontal displacement of the central wall, bring the settlement under effective control, make the secondary lining form a closed ring as early as possible and reduce the stress on the primary support.
Key words: Beijing Metro, mined 4arched tunnel, artificiallyfilled strata, construction sequence, side heading method
CLC Number:
U 455.41+1
MENG Wei, YE Ming. Case Study on Design of Mined 4arched Tunnel in Artificiallyfilled Soil Strata[J]. Tunnel Construction, 2015, 35(3): 250-256.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.03.010
http://www.suidaojs.com/EN/Y2015/V35/I3/250