ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S1): 74-79.DOI: 10.3973/j.issn.1672-741X.2015.S1.015
Previous Articles Next Articles
WANG Zheqiang
Received:
Revised:
Online:
Published:
Abstract:
Compared to the conventional optical leveling monitoring, the static leveling monitoring has such advantages as high monitoring accuracy, real time monitoring and automatic data acquisition. In the paper, the working principle of the static leveling monitoring is presented, and the application of the static leveling monitoring in two works cases is described. The two works cases are located in complex environment and have high engineering risks. Due to the application of the static leveling monitoring, automatic data acquisition and transmission are realized, and the works under construction and the surrounding environment are well monitored. The monitoring provides great support for the safety of the works cases.
Key words: automation, static leveling, Metro works, deep foundation pit, existing railway, deformation
CLC Number:
U 455
WANG Zheqiang. Application of Static Leveling Monitoring in Construction of Metro Works[J]. Tunnel Construction, 2015, 35(S1): 74-79.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S1.015
http://www.suidaojs.com/EN/Y2015/V35/IS1/74