ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S2): 68-75.DOI: 10.3973/j.issn.1672-741X.2015.S2.013

Previous Articles     Next Articles

Shield Tunneling Technology in Old Urban Area in Nanchang

LIU Wei   

  1. (Jiangxi Zhongchang Engineering Consultation and Supervision Co., Ltd., Nanchang 330088, Jiangxi, China)
  • Received:2015-01-19 Revised:2015-11-13 Online:2015-12-15 Published:2015-12-24

Abstract:

During the construction of No. 5 and No. 6 bid sections of Nanchang Metro, ground surface settlement, gushing, water leakage and other incidents may occur. In the paper, the countermeasures taken to cope with the ground surface settlement, gushing, water leakage, and direction deviation etc. are presented. 

Key words: old urban area in Nanchang, ground surface settlement control, heterogeneous ground, gushing control, sand/water leakage at tunnel portal

CLC Number: