ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2017, Vol. 37 ›› Issue (4): 394-400.DOI: 10.3973/j.issn.1672-741X.2017.04.002

Previous Articles     Next Articles

Decision Support System for Tunnel Operation and Maintenance Based on BIM and Tunnel Whole Life Cycle Information

HU Min1, 2, LIU Panpan2, 3, YU Gang1, 2, SHI Yongquan4,*   

  1. (1. SHUUTS SILC Business School, Shanghai University, Shanghai 201400, China; 2. SHUSUCG Research Center for Building Industrialization, Shanghai University, Shanghai 200072, China; 3. Department of Civil Engineering, Shanghai University, Shanghai 200072, China; 4. Shanghai Tunnel Engineering Co., Ltd., Shanghai 200232, China)
  • Received:2016-12-12 Revised:2017-03-22 Online:2017-04-20 Published:2017-04-28

Abstract:

Visual and intelligent decision support system based on building information modeling (BIM) and tunnel whole life cycle information is built so as to solve management and decision difficulties of highway tunnel operation and maintenance, i.e. numerous management objects, decentralized information and complex spacetime characteristics, etc. Standardization, visualization and intelligentization are regarded as design principles for the system based on BIM operation and maintenance model. The multisource information integration of design, construction and operation and maintenance of the system can be realized by code standardization and information mapping table. It is composed of 5 layers of perception layer, network layer, data layer, analysis layer and interaction layer. The disease diagnoses and assessment, abnormal detecting and fault diagnosis of equipment and maintenance decision optimization of the system can be realized by intelligent analysis technology. The users can learn the site situation quickly and improve the efficiency and quality of tunnel operation and maintenance through 3D visualization interface of the system. The system has been successfully used in tunnel on Dalian Road in Shanghai and good effects have been achieved.

Key words: highway tunnel, whole life cycle, BIM, tunnel operation and maintenance, decision support system

CLC Number: