ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2017, Vol. 37 ›› Issue (S1): 121-127.DOI: 10.3973/j.issn.1672-741X.2017.S1.020
Previous Articles Next Articles
WANG Xingbin
Received:
Revised:
Online:
Published:
Abstract:
The tunnel construction method plays an important role in deformation/displacement control, organization, cost, schedule and structural safety. The applicabilities of different construction methods to Yanjia Tunnel and Guanyazi Tunnel on Guzhu Highway in sericite carbonaceous slate are studied, so as to solve the problems of large deformation, collapse and cracking of primary support and secondary lining. According to construction method analysis and optimization results, the threebench method, CRD method and doubleside drift method show good applicability to large deformation control. Besides, advance presupport can avoid tunnel collapse obviously.
Key words: tunnel in carbonaceous slate, construction methods, threebench method, CRD method, doubleside drift method, tunnel large deformation
CLC Number:
U 455.4
WANG Xingbin. Study of Application of Different Construction Methods to Tunnel Largedeformation Control in Carbonaceous Slate[J]. Tunnel Construction, 2017, 37(S1): 121-127.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2017.S1.020
http://www.suidaojs.com/EN/Y2017/V37/IS1/121