ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2018, Vol. 38 ›› Issue (2): 249-254.DOI: 10.3973/j.issn.2096-4498.2018.02.013
Previous Articles Next Articles
WANG Xiaodong1, 2, YU Gang1, 3, *, WU Huiming1, 4
Received:
Revised:
Online:
Published:
Abstract:
The problem of repetitive modeling of traditional method for shield segment should be solved. As a result, the parameterized modeling of shield segment based on Revit is introduced. The method includes parameterization of variable parameters of standard prefabricated shield segment, new prefabrication method of shield segment by parameter modification and rapid and accurate shield segment dislocation joint by modifying rolling angle and distance between shield segment and reference point. The modeling efficiency and shield segment assembling accuracy can be greatly improved by Revit parameterized modeling method. The method has been successfully applied to design of shield segment of Hongmeinanlu Tunnel in Shanghai.
Key words: Revit group, building information modeling (BIM), parameterized modeling, shield segment
CLC Number:
U 45
WANG Xiaodong, YU Gang, WU Huiming. Application of Parameterized Modeling of Shield Segment Based on Revit[J]. Tunnel Construction, 2018, 38(2): 249-254.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2018.02.013
http://www.suidaojs.com/EN/Y2018/V38/I2/249