ISSN 2096-4498
CN 44-1745/U

Tunnel Construction ›› 2018, Vol. 38 ›› Issue (5): 747-752.DOI: 10.3973/j.issn.2096-4498.2018.05.004
Previous Articles Next Articles
ZHOU Kun1, WANG Hua2,*
Received:
2018-03-12
Revised:
2018-05-09
Online:
2018-05-20
Published:
2018-06-01
CLC Number:
ZHOU Kun, WANG Hua. Application of Crosshole CT Method to Pile Foundation Distance Detection of Metro Engineering[J]. Tunnel Construction, 2018, 38(5): 747-752.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2018.05.004
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
Support by Beijing Magtech Co.ltd support@magtech.com.cn