[1] |
CHEN Kunyang, CHEN Xiangsheng, WANG Lei, YANG Wensheng, WU Huanyu, DUAN Huanbo.
Greenhouse Gas Emissions of Open
[J]. Tunnel Construction, 2023, 43(S1): 189-197.
|
[2] |
GUO Fei, KONG Heng, SUN Kaiyue, TAO Lianjin, ZHANG Yu, MENG Yajuan.
Calculation Method of Carbon Emission in Metro Deep and
Large Foundation Pit Construction
[J]. Tunnel Construction, 2022, 42(S2): 197-206.
|
[3] |
CHEN Zheng, GUO Yalin, GUO Chun.
Greenhouse Gas Prediction Using Whale Optimization
AlgorithmDeep Extreme Learning Machine in Chengdu
Metro Construction Stage
[J]. Tunnel Construction, 2022, 42(12): 2048-2063.
|
[4] |
LIU Hao, WU Qiang, LI Wanbao, SU Jiankun.
Policy for Whole Life Cycle Safety Guarantee of Tunnel
Engineering
[J]. Tunnel Construction, 2021, 41(S1): 75-.
|
[5] |
CHEN Dan, LIU Zhe, LIU Jianyou, FANG Qian, HAI Lu.
StateofArt and
Prospects for Intelligent Construction Technology for Railway
Shield Tunneling
[J]. Tunnel Construction, 2021, 41(6): 923-932.
|
[6] |
WANG Shulei, GUAN Panfeng, DING Guosheng.
Risk Management in Early Stage of Connection Gallery
with Freezing Method: a Case Study on Freezing Project of Superlong
Connection
Gallery and Pump Station on Ziyang StationWuliting
Station of
Fuzhou
Rail Transit Line 2
[J]. Tunnel Construction, 2020, 40(S1): 258-265.
|
[7] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[8] |
TANG Yangyi, WU Xianguo, CHEN Hongyu, TAO Yanyan, WANG Hu, ZENG Tiemei, ZHANG Limao .
Evaluation of Floating Risk of Shield Tunnel Segments Based on Cloud Model and D-S Evidence Theory
[J]. Tunnel Construction, 2019, 39(12): 2011-.
|
[9] |
WANG Jianbo, YOU Weibao, LIU Fangmeng, ZHANG Wei, YANG Diying.
Study of Risk Evaluation of Urban Underground Utility Tunnel PPP Project Based on GRASPA
[J]. Tunnel Construction, 2018, 38(9): 1446-1455.
|
[10] |
HOU Dongsai, ZHANG Xiao, WANG Lei.
Risk Evaluation of Tunnel Water Inrush Based on Comprehensive WeightingTOPSIS Method and Its Application
[J]. Tunnel Construction, 2017, 37(6): 691-699.
|
[11] |
HU Min, LIU Panpan, YU Gang, SHI Yongquan.
Decision Support System for Tunnel Operation and Maintenance Based on BIM and Tunnel Whole Life Cycle Information
[J]. Tunnel Construction, 2017, 37(4): 394-400.
|
[12] |
SONG Bo, WU Ruijuan, NIU Fayang.
Research on Risk Evaluation Method of PPP Financing Mode for Urban Rail Transit Based on OWA and Grey Clustering Method
[J]. Tunnel Construction, 2017, 37(4): 435-441.
|
[13] |
SUN Yanfeng.
Application of Ideal Point Method to Evaluation of Tunnel Collapse Risk Grade
[J]. Tunnel Construction, 2016, 36(11): 1310-1316.
|
[14] |
ZHANG Lifeng, YAN Zihai, PENG Jiaqiang, HU Xianguo.
Prospects and Study on Development of Underground Space in Hangzhou, China
[J]. Tunnel Construction, 2015, 35(4): 285-291.
|
[15] |
HONG Kairong.
Stateofart and Prospect of Tunnels and Underground Works in China
[J]. Tunnel Construction, 2015, 35(2): 95-107.
|