ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2020, Vol. 40 ›› Issue (9): 1285-1291.DOI: 10.3973/j.issn.2096-4498.2020.09.006

Previous Articles     Next Articles

Investigation into Shearing Capacity of VisibleConcealed Twincorbel Used in a Metro Station Excavated by CutandCover TopDown Method

ZHANG Lin1, WU Yun2   

  1. (1. No.4 Engineering Corporation Limited of CR20G, Qingdao 266061, Shandong, China; 2. School of Civil Engineering, Inner Mongolia University of Science and Technology, Baotou 014010, Inner Mongolia, China)
  • Online:2020-09-20 Published:2020-10-10

Abstract: The design of joints of concretefilled steel tubular (CFST) columnreinforced concrete (RC) beam with visibleconcealed twincorbel in the metro station excavated by cutandcover topdown method in Hohhot, Inner Mongolia is of great significance. As a result, a new type of CFST joint with visibleconcealed twincorbel is put forward, which is analyzed by simulation software ABAQUS and model test. Meanwhile, analysis is made on the key design parameters of the joint. The results show that: (1) The effective weld length between the annular corbel rib plate and the steel pipe wall is the main parameter affecting the shear resistance of the node, and by adjusting which the mechanical properties of the joint can be significantly improved. (2) In order to ensure the effective transfer of shear force, 8% of the diameter of steel tube column should be taken as the appropriate value. (3) When the shear force at the beam column joint is large, the visibleconcealed twincorbel can be used, which has high bearing capacity and excellent mechanical properties as well as a wide range of engineering application prospects.

Key words: metro station, cutandcover topdown excavation method, visibleconcealed twincorbel, ABAQUS, shearing capacity

CLC Number: