Abstract: SichuanTibet Railway is the most challenging railway project worldwide to date due to its great elevation difference, intensive tectonic activities, frequent mountain disasters, fragile ecological environment and severe hypoxia at high altitude. In this paper, the challenges to be encountered during TBM construction for SichuanTibet Railway under various complex conditions, including numerous long and large tunnels, high insitu stresses, and highly active faults etc., are described in details. Innovative design concepts and characteristics of TBMs for construction of SichuanTibet Railway are systematically analyzed in eight aspects such as alpinecold condition, longdistance driving in hard rock and rockburst etc. From these analysis, conclusions are drawn as follows: (1) Advanced geological probing and treatment is a main means of risk control for TBM tunneling during construction of SichuanTibet Railway tunnels. (2) It is particularly necessary to adopt innovative design TBM with "dual shield + rock bolt & shotcrete" or dualsupport TBM for constructing rockburst prone tunnels. (3) For tunnels prone to large deformation, open dualmode TBMs or TBMs with innovative structure design are preferred. It is expected to provide some reference for targeted TBM design and tunnel construction in the later stage.
Key words: SichuanTibet Railway, extralong tunnel, TBM, alpinecold condition; high insitu stress, high ground temperature, adverse geological conditions
CLC Number:
U 45
CHEN Kui, FENG Huanhuan, HE Fei. Challenges in Tunnel Construction and Preliminary Study on Innovative TBM Design for SichuanTibet Railway[J]. Tunnel Construction, 2021, 41(2): 165-174.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2021.02.002
http://www.suidaojs.com/EN/Y2021/V41/I2/165
Smoke Exhaust Structure Type of Emergency Rescue Station of Extralong Tunnel at HighAltitude Plateau Areas
Key Technology and Application of Efficient Tunneling of an Extra-Long Tunnel Bored by Two Tunnel Boring Machines
Research on Heat Transfer Model of Tunnel Surrounding Rock and
Effect of Thermal Insulation Layers
TBM Selection and Key Technologies of Qiandao Lake Water Distribution Project
Study and Practice on Negative Ring Launching Technique for DoubleShield TBM Used in Qingdao Metro
Discussion on Construction Technology for Mode Conversion between Earth Pressure Balance and SingleShield TBM of DoubleMode Shield