Tunnel Construction ›› 2022, Vol. 42 ›› Issue (S1): 433-441.DOI: 10.3973/j.issn.2096-4498.2022.S1.051

Previous Articles     Next Articles

Key Technology and Application of Efficient Tunneling of an Extra-Long Tunnel Bored by Two Tunnel Boring Machines

WEN Bin   

  1. (China Railway Tunnel Stock Co., Ltd., Zhengzhou 450001, Henan, China)
  • Online:2022-07-22 Published:2022-08-23

Abstract:  To reduce the interaction of the two tunnel boring machines(TBMs) in the extralong tunnels and further realize coordinated, highefficient, and rapid construction, a case study is conducted on a bid section of the North Xinjiang water supply phase project. Then the TBM assembly tunnel structure, belt conveyor mucking, track transportation, and tunnel drainage are analyzed. Finally, some key techniques for highefficient doubleTBM construction, including structural optimization of TBM assembly tunnel, doubledirectional multilevel belt conveyor mucking, comprehensive track transportation, and convergent cascade drainage, are formed based on the construction idea of independent operation and unified management. The application effect show that the optimized structure of the assembly tunnel is reasonable, which meets the needs of synchronous assembly of two TBMs and helps to realize the establishment of key technical systems such as belt conveyors, track transportation, and construction drainage. During tunneling stage, various systems operated well, and the expected goals have been achieved steadily.

Key words: extra long tunnel, open TBM, one tunnel bored by two TBMs, auxiliary tunnel, doubledirectional multilevel belt conveyor mucking, interchangeable rail transit, convergent cascade drainage