ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2021, Vol. 41 ›› Issue (10): 1644-1653.DOI: 10.3973/j.issn.2096-4498.2021.10.003

Previous Articles     Next Articles

Suggestions and Considerations on Equipment Selection for Constructing Sichuan-Tibet Railway Tunnels at High Altitudes

XING Bo1 FENG Huanhuan2   

  1. (1. China Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co., Ltd., Xinxiang 453000,  Henan, China; 2.China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China)
  • Online:2021-10-20 Published:2021-11-03

Abstract: The construction of the SichuanTibet railway faces numerous challenges such as significant terrain elevation differences, complex geological characteristics, and a harsh climatic environment, among which the high altitude has particularly significant effects on the Sichuan-Tibet railways construction. The influence factor of high altitude on construction equipment by drillandblast method for YaanLinzhi section is analyzed from the aspects of power system, electrical control system, fluid control system, and air compressor performance to realize mechanized construction of SichuanTibet railway tunnels. Some recommendations for equipment selection of key construction processes of drillandblast construction operations in cold and highaltitude environments, such as advance support, excavation, primary support, and secondary lining, are made. The equipment includes advance drill and support equipment, rockbreaking jumbos, arch frame installation equipment, shotcrete equipment, crusher + belt conveyor mucking system, excavation + loading + electrical transport equipment, and mobile dedusting equipment.

Key words: Sichuan-Tibet railway tunnel, drillandblast method, highaltitude environment, equipment comparison and selection

CLC Number: