Route Selection Scheme Research on BadongXiangluping Tunnel Group on ZhengzhouWanzhou Railway in Karst Geology

LIU Ke1, LI Yajun1, WANG Qingchuan2, LIU Xiongwei1, SHANG Hanchun1   

  1. (1. CREEC (Chengdu) Survey, Design and Research Co., Ltd., Chengdu 610031, Sichuan, China; 2. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China)
  • Online:2021-10-20 Published:2021-11-04

Abstract: The deephole drilling results of the BadongXiangluping tunnel group on the ZhengzhouWanzhou railway crossing karst area revealed multiple adverse geological conditions, including waterflow sound, cold wind leakage, and giant haftfilled karst with a diameter exceeding 80 m. Thus, a regional hydrogeological survey and systematic groundwater hydrodynamic analysis are conducted. The findings indicate that the karst cave bottom is an underground river. Consequently, the existing tunnel route scheme for the preliminary design phase is improved in the construction drawing. Due to the control of station location, elevation, and longitudinal slope of the route, it is impossible to conduct wideranging adjustments on threedimensional space. For that reason, five route schemes are proposed for the plane. Finally, a thorough comparison and selection of main adverse geologies, karst development degree, surrounding rock grade, auxiliary tunnel, construction risk, and project investment are carried out. Considering construction risk and relative investment, the D8K route scheme that avoids the underground river is recommended. Overall, the construction excavation results show a successful route selection.

Key words: railway tunnel, unfavorable geology, karst, geological route selection, line relocation, scheme comparison and selection