[1] |
XIAO Mingqing, XU Chen, XIE Biting, CHEN Wenpeng, WANG Kejin.
Research on Design Technology of Sequential Supporting for High-Speed Railway Tunnel Constructed by Drilling-and-Blasting Method
[J]. Tunnel Construction, 2023, 43(3): 369-382.
|
[2] |
LI Lei, ZHU Chao, LIU Zhichun, AN Zhifei, LI Ning.
Construction Timing of Tunnel Secondary Lining in
Squeezing Rocks Based
on Statistics of Deformation Stabilization Time
[J]. Tunnel Construction, 2023, 43(1): 17-26.
|
[3] |
CHEN Qiao, LI Zhijun, NIU Tongtong, ZHANG Hepei, ZHOU Yi, YU Jingbo.
Optimization of Tunnel Lining CrossSection
by Tunnel Boring Mahine Method in
Plateau Railway with Complex Geology
[J]. Tunnel Construction, 2022, 42(S2): 334-344.
|
[4] |
LI Zhijun, LIU Guangzhi, ZHOU Yi, LIU Weizheng, YU Jingbo, CHEN Qiao.
Application of Cantilever Roadheader Method in Loose
Accumulation of a Tunnel on Plateau Railway
[J]. Tunnel Construction, 2022, 42(S2): 363-371.
|
[5] |
YI Dingda, LI Zhijun, YU Jingbo, CHEN Qiao, LIU Guangzhi.
Application of Composed Consolidation Support
Technology in
Collapse Treatment of a Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 406-411.
|
[6] |
FANG Yuzhong, QI Rujian, YANG Haihang, LIU Sheng, LUO Xiangang, CHEN Zhen, HE Yatao.
Grouting Construction Technology for Prefabricated and
Assembled Arches of
Railway Tunnel Lining Constructed by Mining Method
[J]. Tunnel Construction, 2022, 42(S2): 421-427.
|
[7] |
WANG Tao, ZANG Jianbin, LI Peng.
A Review on Railway Tunnel Aerodynamics
[J]. Tunnel Construction, 2022, 42(S1): 7-18.
|
[8] |
ZHANG Zhigang, WU Ben, CHEN Jian, WU Chenglong, LIU Jiajun, LI Jinhui.
Effect of HeavyHaul Train on Bearing Capacity
of Cracked Tunnel Lining
[J]. Tunnel Construction, 2022, 42(S1): 56-65.
|
[9] |
TANG Jincai, CUI Youlong, TANG Junlin, WANG Gao.
Analysis of Large Deformation of Xiaoxiangling Tunnel
Based on Mechanical State Test of Surrounding Rock
[J]. Tunnel Construction, 2022, 42(S1): 238-248.
|
[10] |
LIU Kai, WU Zaixin, YANG Jizhong, OU Xiaoqiang, GUAN Haoyu.
Fatigue Life and AntiVibration
Measures of HighSpeed Railway Tunnel under Aircraft Landing Impact Load
[J]. Tunnel Construction, 2022, 42(S1): 281-288.
|
[11] |
WANG Rulei, WANG Zhijie, XU Haiyan.
Deformation Characteristics of Tunnel Face and
Corresponding Control Measures in FullyWeathered
Red Sandstone Stratum
[J]. Tunnel Construction, 2022, 42(S1): 301-311.
|
[12] |
WANG Song, XIE Yunlai, QING Weichen, YANG Changyu, WANG Jianhong, YANG Yi.
Design of Prefabricated Lining Structure at Tunnel
Arch Constructed with Mining Method
[J]. Tunnel Construction, 2022, 42(S1): 360-368.
|
[13] |
TIAN Siming, WU Kefei, YU Li, LI Xu, GONG Jiangfeng, WANG Xindong.
Key Technology of AntiSeismic for Railway Tunnels Crossing Active
Fault Zone
[J]. Tunnel Construction, 2022, 42(8): 1351-1364.
|
[14] |
MA Weibin, WANG Zhiwei.
Research on Prefabrication and Assembly of Railway
Tunnels Excavated Using Drilling-and-Blasting and Prospects of Intelligent Construction
[J]. Tunnel Construction, 2022, 42(7): 1119-1134.
|
[15] |
WANG Yong, AN Zheli, MA Weibin, ZHENG Zefu, GUO Xiaoxiong.
StateofArt and
Development Trend of Tunnel Inspection Technology in
China, Japan, and South Korea
[J]. Tunnel Construction, 2022, 42(7): 1135-1145.
|