Application of Cantilever Roadheader Method in Loose Accumulation of a Tunnel on Plateau Railway

LI Zhijun1, 2, LIU Guangzhi2, ZHOU Yi2, LIU Weizheng3, 4, YU Jingbo2, *, CHEN Qiao2   

  1. (1.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,Sichuan,China;2.China Railway Tunnel Group Co., Ltd.,Guangzhou 511458,Guangdong,China;3.School of Civil Engineering,Central South University,Changsha 410075,Hunan,China;4.National Engineering Research Center of High Speed Railway Construction Technology,Central South University,Changsha 410075,Hunan,China)
  • Online:2022-12-30 Published:2023-03-24

Abstract:

To solve the problem of large deformation of tunnel support and high risk of blasting excavation in loose accumulation, based on the entrance section of a tunnel on plateau railway, the twobench method using cantilever roadheader is adopted to excavate the weak surrounding rock of loose accumulation. Based on an excavation test section of about 60 m long on the left and right lines, the excavation plan, construction progress, quality control, safety and environmental protection, and other construction capabilities of cantilever roadheader are summarized, and the applicability of cantilever roadheader is analyzed by comparing with local blasting, excavator and breaker methods in deformation control and technical and economic indicators. The results show that: (1The accumulative settlement using the cantilever tunnel method is 20 mm, the peripheral convergence is 15 mm, and the linear overexcavation value is ranged from 10 to 15 cm, which are significantly lower than the results of blasting and excavator with breaker. 2)2.5 hours can be saved for each 1.2 m footage of circulation, and the progress of Grade surrounding rock can reach 30 m/monththe noise in the cave is low, and the content of particulate matter is also low. 3The cantilever roadheader has good adaptability in the accumulation body at the portal section and soft surrounding rocks of Grade , , and , and is most suitable for the section excavation construction with the height range of 4.0 to 7.5 m and width range of 5.5 to 8.5 m by bench method.

Key words: cantilever roadheader, plateau railway tunnel, tunnel portal, loose accumulation, application of cantilever roadheader