Tunnel Construction ›› 2022, Vol. 42 ›› Issue (6): 1044-1052.DOI: 10.3973/j.issn.2096-4498.2022.06.012

Previous Articles     Next Articles

Key Techniques of Excavation and Blasting in ShallowBuried Soft and Hard Strata of Tunnel Boring Machine Preparatory Tunnel of Plateau Railway

LI Zhijun1, 2, LIU Guangzhi2, YU Jingbo2, *, CHEN Qiao2   

  1. (1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan, China; 2. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China)

  • Online:2022-06-20 Published:2022-07-05

Abstract: Two open tunnel boring machines bored the left and right line preparatory tunnels of a tunnel of the advanced bid doubletunnel and onebridge project. During the drillandblast construction, waterrich Grades , , and surrounding rocks with soft and hard soils were encountered. As a result, the principle technology varies with lithology, active treatment, and vibration reduction is adopted. Furthermore, techniques such as bench change and automatic blasting, threebench reserved core soil and annular pilot tunnel loose blasting, cutting before blasting and edge cutting by hydraulic top heading milling excavation and lower bench loose blasting, top heading hydraulic hammer excavation and edge cutting by scarifier, and arch foot weak blasting are employed, resulting in successful completion of preparatory tunnels.

Key words: plateau railway tunnel, preparatory tunnel, vibration reduction, smooth blasting, reserved core soil