Synchronous Backfilling Technology for Gravel and Bottom Grouting Behind Double-Shield Tunnel Boring Machine Segment: A Case Study of a

Section of Qingdao Metro Line 6

WANG Shouhui1, YANG Xing2, JIANG Yusheng2, LIU Quanwei1, 3,  ZHAO Jizeng1, 3, ZHU Zhijing4,SHAO Changzhi4, TAN Zhuolin5, YANG Zhiyong2, *   

  1. (1. Qingdao Metro Group Co., Ltd., Qingdao 266045, Shandong, China; 2. School of Mechanics and Civil Engineering,China University of Mining and Technology Beijing, Beijing 100083, China; 3. Qingdao Metro Line 6 Co., Ltd.,Qingdao 266427, Shandong, China; 4. School of Civil Engineering, Shandong University, Jinan 250002,Shandong, China; 5. China Railway No. 2 Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China)

  • Online:2023-11-20 Published:2023-12-08

Abstract: To address challenges related to untimely gravel backfilling, suboptimal backfilling effects, and delayed grouting behind the doubleshield tunnel boring machine(TBM) segment, a novel TBM shield tail sealing plate that is characterized by high wearresistance, easy assembly, elevated elasticity, and effective sealing is proposed. This design considers the structural mode of the TBM shield tail and its positional relationship with surrounding rocks and segments, facilitating synchronous backfilling of gravel and bottom grouting. To validate the feasibility of this technology, a field test is conducted on a section of Qingdao metro line 6. Primary indices, such as grout mixing ratio, grouting amount, and positions are collected. The results highlight the following key findings: (1) The installation of the sealing plate ensures the advance backfilling of gravel, thereby creating favorable conditions for synchronous bottom grouting. (2) A slurry with a watercement ratio of 2.35 and a consistency of less than 13 cm is sufficient to meet the gravel grouting requirements. (3) For the lower segment, it is recommended that grouting points be positioned at a 60° angle against the WT〗Y〖WT5《TNR》〗line of the tunnel crosssection to prevent grout overflow.

Key words: metro, doubleshield tunnel boring machine, segment, gravel, grouting, synchronous backfill