ISSN 2096-4498
CN 44-1745/U

ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2024, Vol. 44 ›› Issue (5): 1086-1095.DOI: 10.3973/j.issn.2096-4498.2024.05.016
Previous Articles Next Articles
Key Technology for Water Blocking and Grouting Construction in Chamber of Bottom Car Yard of Microcrack Vertical Shafts Under Extremely
High Water Pressure: A Case Study of Vertical Shaft No. 1 of Gaoligongshan Tunnel on DaliRuili Railway
GAO Guangyi, ZHAI Kangbo, GU Qingtian