| [1] |
DAI Zhiren, ZHANG Shasha, LI Guoliang, ZOU Weilie, LI Mingyu, JIA Jianwei, YE Fei, YANG Zhiquan, HAN Xue.
Surface Collapse Mechanism Induced by Rail Transit Underground Engineering and Corresponding Countermeasures
[J]. Tunnel Construction, 2025, 45(8): 1451-1458.
|
| [2] |
MA Zhifu, TIAN Siming, YANG Changxian, WANG Wei, WANG Jiawei.
Study on Effects of
Temperature Field Distribution in Railway Tunnels
in Cold Regions and Countermeasures
[J]. Tunnel Construction, 2024, 44(12): 2332-2349.
|
| [3] |
GUO Xiaoxiong, MA Weibin, LUO Chi, AN Zheli, CHANG Kai, ZHENG Zefu, XU Tianyuan.
Key Issues and Performance
Assurance Measures of Waterproofing and Drainage
Systems in Railway Tunnels
[J]. Tunnel Construction, 2024, 44(12): 2424-2441.
|
| [4] |
MA Gang, KANG Zuo, GAO Huyan, YU Wenlong, KANG Jiawei.
Analysis on Safety Risk of Urban Metro Tunnel
Construction in Saturated Soft Loess Stratum and Its Countermeasures
[J]. Tunnel Construction, 2023, 43(S1): 425-433.
|
| [5] |
QIAO Xiong, YANG Xin.
Current Situation and Development of Causes of
Secondary Lining Crack in
Loess Tunnel and Countermeasures
[J]. Tunnel Construction, 2023, 43(10): 1657-1676.
|
| [6] |
TANG Jincai, CUI Youlong, TANG Junlin, WANG Gao.
Analysis of Large Deformation of Xiaoxiangling Tunnel
Based on Mechanical State Test of Surrounding Rock
[J]. Tunnel Construction, 2022, 42(S1): 238-248.
|
| [7] |
SUN Jun, JIANG Yu, LI Ning, WANG Bo, FAN Yong.
Surrounding Rock of Haidong Water Conveyance Tunnel of Central Yunnan Water Diversion Project: Risks and Countermeasures
for
Using Ordinary Prestressed Anchor Cables
[J]. Tunnel Construction, 2022, 42(8): 1321-1330.
|
| [8] |
DU Chuangdong, HONG Kairong, LI Zhijun, YANG Yandong.
Key Technologies of Tunnel Boring Machine Passing
through Unfavorable Geology: a
Case Study of Entrance Section of a Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(7): 1274-1288.
|
| [9] |
WANG Yanjie, LI Cangsong, SHI Yongyue, ZHANG Tao, WANG Bin.
Adaptability Analysis of TBM in Main Unfavorable
Geological of Sichuan-Tibet Railway Tunnel and Its Key
Construction Technologies
[J]. Tunnel Construction, 2021, 41(S1): 470-.
|
| [10] |
ZHAO Yong, SHI Shaoshuai, TIAN Siming, LI Guoliang, TAO Weiming, GUO Weidong.
Technical Difficulties and Countermeasure Suggestions in Tunnel Construction of Ya′an-Linzhi Section of Sichuan Tibet Railway
[J]. Tunnel Construction, 2021, 41(7): 1079-1090.
|
| [11] |
CHEN Tianming.
Causes and Countermeasures for Collapse in a WaterRich
Moraine Tunnel in a Plateau Area: a Case Study on
Milin Tunnel of LhasaNyingchi
Railway
[J]. Tunnel Construction, 2021, 41(2): 274-282.
|
| [12] |
MEI Jialin, TANG Zhennong, DU Zhigang, JIAO Fangtong.
Improvement Countermeasures and Application of Traffic Engineering
Facilities at Entrance Section of Expressway Tunnel
[J]. Tunnel Construction, 2020, 40(4): 545-551.
|
| [13] |
ZHAO Xiaopeng.
Research on Construction Risks and Countermeasures of Piperoof
Undercutting Method in Saturated Soft Soil
[J]. Tunnel Construction, 2020, 40(10): 1533-1539.
|
| [14] |
WANG Yan.
Construction Risks and Countermeasures for Largediameter Slurry Shield Used in Shiziyang Tunnel on FoshanDongguan Intercity Railway
[J]. Tunnel Construction, 2019, 39(6): 983-988.
|
| [15] |
XIA Runhe.
Analysis of Metro Tunnel Collapse Accident Based on Accident Mechanism and Responsibility and Its Prevention Strategy
[J]. Tunnel Construction, 2019, 39(10): 1601-1609.
|