ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2005, Vol. 25 ›› Issue (5): 45-48.

• wenzhang • Previous Articles     Next Articles

Treatment of Rockmass Slippage at Exit Portal of 3track
Dabanxi Tunnel on Yuhuai Railway

XU Zhi-Yong   

  1. Research &|Design Institute of Railway Construction, |Beijing |102600|China
  • Received:2005-05-20 Online:2005-10-20 Published:2009-12-19

Abstract:

This paper briefly introduces the rockmass slippage that happened at the exit section of 3track Dabanxi tunnel on Yuhuai Railway and analyzes on the causes and treatment measures of the slippage. The paper places emphasis on the reinforcement construction of forepoling and Maitype grouting rockbolts and on the results of the application of monitoring and measurement. The paper also raises some suggestions for the construction of the portal sections of shallowburied largespan tunnels located in soft ground in raining seasons.

Key words: 3track railway tunnel  , shallowdepth soft ground rockmass slippage  , treatment