Tunnel Construction ›› 2006, Vol. 26 ›› Issue (2): 71-73.DOI: B
• wenzhang • Previous Articles Next Articles
DIAO Yuan-Gen
Received:
Online:
Published:
Abstract:
The article presents the delivery scheme of the concrete for the secondary lining of the 2nd contract section of the water delivery tunnel of Zhongjiang People's Irrigation Canal Project. In the scheme, a small vertical shaft is installed, through which the concrete is delivered. Furthermore, the article also presents the selection, realization and evaluation of the concrete delivery scheme.
Key words: inclined shaft, small vertical shaft, concrete delivery, buffering installation
CLC Number:
U455.4
DIAO Yuan-Gen. Concrete Delivery Scheme of Small Tunnel with Inclined Shaft: a Case Study[J]. Tunnel Construction, 2006, 26(2): 71-73.