ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (3): 48-50,54.DOI: B
• wenzhang • Previous Articles Next Articles
ZHANG Ji-Dou
Received:
Online:
Published:
Abstract:
During the construction of the left tube of Bixi tunnel on Taijing highway, huge cracks and deformations occur to the shotcreting layers of the primary reinforcement and the situation tends to grow more intense. On basis of such situation, the article analyses on the reasons for the huge deformations and presents the technical schemes and construction measures taken to overcome the situation, as well as the effects of the measures.
Key words: highway tunnel  , huge deformation  , design  , construction
CLC Number:
 
U455.4
ZHANG Ji-Dou. Design and Construction of Tunnel Section with Huge Deformations: Case Study on Bixi Tunnel on Taijing Highway[J]. Tunnel Construction, 2006, 26(3): 48-50,54.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I3/48