ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (4): 78-80.DOI: B
• wenzhang • Previous Articles Next Articles
WANG Guang-Hui, FANG Dun-Bei
Received:
Online:
Published:
Abstract:
The exit portion of Gaoyangzai tunnel on Yiwan railway is located in fractured accumulative ground. It is of great difficulty to build largespanned doubletrack railway tunnels under such difficult geological conditions. Monitoring and measurement provide basis and safety guarantees for the rapid construction of the tunnel. The article presents the execution plan of the monitoring and measurement, analyses the monitoring results and expatiates on the feasibility of building largespanned doubletrack tunnel in fractured accumulative ground.
Key words: tunnel lined largespan portion  , fractured accumulative ground  , monitoring and measurement
CLC Number:
 
U456.3+1
WANG Guang-Hui, FANG Dun-Bei. Application of Monitoring and Measurement in Lined Largespan Portion of Exit Section of Gaoyangzai Tunnel[J]. Tunnel Construction, 2006, 26(4): 78-80.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I4/78