ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2006, Vol. 26 ›› Issue (5): 53-55.DOI: B
• wenzhang • Previous Articles Next Articles
SUN Guo-Qiang
Received:
Online:
Published:
Abstract:
Taking the construction of the gypsum section of a superlong highway tunnel as an example, the paper presents the technical measures taken during the construction of the gypsum section of the tunnel, so as to ensure the structural safety of the tunnel during excavation construction and to guarantee the operation safety and service life of the tunnel. The paper can provide reference for the construction of tunnels in similar geology in the future.
Key words: tunnel gypsum geology construction  , technology
CLC Number:
 
U455.4
SUN Guo-Qiang. Construction Technology for Tunnel Section in Gypsum Geology[J]. Tunnel Construction, 2006, 26(5): 53-55.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2006/V26/I5/53