| [1] |
XU Guangyi, QI Zhichong, ZHAO Zihui, JIA Tao, LI Ming, WU Hao, GENG Qi.
Design and Testing of a Cone-Shaped Cutterhead Based on Boring Method for Enlarged-Diameter Vertical Shafts
[J]. Tunnel Construction, 2026, 46(1): 194-203.
|
| [2] |
ZHU Yanfei, JI Maojie, YU Ning, GUO Yan, PAN Weiqiang, ZHU Ling.
Research and Application of Active Control Press-in Prefabricated Shaft Construction Method in Urban Core Area With Soft Soils
[J]. Tunnel Construction, 2025, 45(S2): 1-10.
|
| [3] |
SUN Yi, YU Hongwei, YE Ming, WU Gensheng, REN Changchun, DU Zhanjun, ZHANG Yunpei, LI Xu, LI Jian.
Intelligent Recognition Methods for Muck Flow Status in Inclined Shaft TBM
[J]. Tunnel Construction, 2025, 45(S2): 214-221.
|
| [4] |
CHEN Zhen.
Experimental Study on On-Site Preparation of Novel Karst Cave Filler Using Shield Waste Sandy Clay
[J]. Tunnel Construction, 2025, 45(S1): 23-31.
|
| [5] |
LIN Huasheng, TANG Xinwei, NIE Ding, HUANG Wenmin, SONG Danqing.
Prediction of Deep and Large Shaft Deformation Based
on Multi-Output Machine Learning Model
[J]. Tunnel Construction, 2025, 45(S1): 113-124.
|
| [6] |
CAO Xiaoyong, ZHANG Menghan, XI Weizheng, XU Ping, YE Fei, HAN Xingbo.
Corrugated Steel Support Design for Highway Tunnel
Shafts: A Case Study of Yinggeling Tunnel
[J]. Tunnel Construction, 2025, 45(S1): 182-192.
|
| [7] |
TAN Jianbing, YANG Jianli, CAO Weiming, SHI Chenghua, PENG Xingyu.
Blasting Excavation Control Technology for Ultra-Deep
Shafts Adjacent to Extra-High Voltage Substations
[J]. Tunnel Construction, 2025, 45(S1): 308-317.
|
| [8] |
CAI Caiwu.
Mechanical Effects of Vertical Shaft Construction in Intercity Railways Using Vertical Machinery Method
[J]. Tunnel Construction, 2025, 45(9): 1640-1648.
|
| [9] |
LIU Xiaolin.
Displacement Measurement Method Integrating Improved Oriented FAST and Rotated BRIEF Feature Points With Lucas-Kanade Pyramid Optical Flow and Its Engineering Application
[J]. Tunnel Construction, 2025, 45(8): 1459-1468.
|
| [10] |
YU Qingzeng, NING Xiangke, ZHANG Xingbin, LI Lei.
Development and Application of a Full-Face
Inclined-Shaft Boring Machine With
a Gravity-Mucking System: A Case Study of Luoning
Inclined Shaft
[J]. Tunnel Construction, 2025, 45(4): 852-860.
|
| [11] |
FANG Xin, LIU Shannan, PENG Xiajun.
Strata Deformation Caused by Construction of Prefabricated Suspended Sinking Shafts in Soft Soil Areas: A Case Study of a Working Shaft of a Connecting Pipe
in Shanghai, China
[J]. Tunnel Construction, 2025, 45(3): 567-578.
|
| [12] |
RONG Chuanxin, TU Zhuo, LONG Wei, ZHANG Runze.
Spatio-Temporal Evolution Pattern and Sensitivity Analysis of Freezing Temperature Field of Shaft in Water-Rich Sand Layer With Groundwater Seepage
[J]. Tunnel Construction, 2025, 45(2): 268-283.
|
| [13] |
CHEN Li, LIU Bing, CAO Zhi, CHEN Jiajia, ZHANG Heng, ZHANG Zhiqiang.
Influence of Natural Wind
on Fire Smoke Diffusion Characteristics Through
Shafts in Extra-Long Highway Tunnels
[J]. Tunnel Construction, 2025, 45(2): 315-323.
|
| [14] |
CHENG Chuantao, LIANG Zhi, WANG Jinchang, IWANAMI Motoi, WU Jian, ZHOU Zelin.
Review of Seismic Design and Research Progress of Chinese and Japanese Shield Tunnel-Working Shaft Joints
[J]. Tunnel Construction, 2024, 44(S1): 36-52.
|
| [15] |
ZHU Ronghui, PEI Hongyu, YU Fangzheng, HUANG Dengxia, LI Jian, WANG Zhiyuan, ZHAO Yongxiang.
Comparison and Selection of Excavation Methods for Super-Large Vertical Shafts in a 700 m Deep Highway Tunnel: A Case Study of 2-2 Shaft of Tianshan Shengli Tunnel
[J]. Tunnel Construction, 2024, 44(S1): 355-367.
|