[1] |
ZHAO Yong, YU Zufa, CAI Jue, LYU Gang, LIU Jianyou, YUE Ling.
Design Concept and Implementation Path for Badaling
Great Wall Station of BeijingZhangjiakou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(7): 929-940.
|
[2] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[3] |
FENG Haibao, LIU Junwei, SU Changxi.
Analysis of Channel Dimensions for Immersed Tube
Element Towed by Selfpropelled Catamaran: a Case Study on
Immersed Tunnel of ShenzhenZhongshan
Link
[J]. Tunnel Construction, 2020, 40(6): 840-844.
|
[4] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[5] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[6] |
LIN Fulong, MENG Xiangbo, WEI Xiaolong, SUN Wei.
Development of Control System of Numerical Controlled Umbrella Drill and Application of Unity3D
[J]. Tunnel Construction, 2019, 39(S1): 451-455.
|
[7] |
HE Xiongfei, ZHANG Xun, LI Zhiguo, XU Jinghe.
Development and Application of New Foam Agent for Anticlogging of Shield Tunneling
[J]. Tunnel Construction, 2019, 39(6): 925-933.
|
[8] |
YANG Yandong, CHEN Kui, ZHANG Xiao.
Development and Application of Key Technologies for TBM Used in Complex Geological Conditions
[J]. Tunnel Construction, 2019, 39(6): 1052-1058.
|
[9] |
ZHANG Zhigang, LI Jinfeng.
Application and Demonstration of HealthSafetyEnvironment Risk Management to Underwater Tunnel of Hong KongZhuihaiMacao Link
[J]. Tunnel Construction, 2019, 39(2): 189-196.
|
[10] |
XIAO Guangzhi.
Problems of Railway Tunnel Construction under Some Special Geological Conditions in China and Their Countermeasures
[J]. Tunnel Construction, 2019, 39(11): 1748-.
|
[11] |
ZHANG Jiangang, MENG Qingming, LI Wei, HE Chuan.
Mechanical Analysis of Segment Joints with Different Arrangement of Waterproof Sealing Gaskets
[J]. Tunnel Construction, 2019, 39(11): 1790-.
|
[12] |
GUAN Xiaojun, LI Chang, QIU Wenge, SHEN Zhijun, GONG Lun, WANG Gang.
Influence of Surrounding Rock Deterioration on Supporting Force of Deep Old Loess Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1806-.
|
[13] |
LI Peng, LI Yang, GAO Yi, YU Shaohui, LI Yingfei.
Analysis and Research on Surface Deformation Law of Pipe Jacking Tunnel Constructed by Cut and Convert Method
[J]. Tunnel Construction, 2019, 39(11): 1838-1847.
|
[14] |
LIN Yi, WANG Lijun, JIANG Jun.
Discussion on Largescale Mechanized Matching and Its Informatied Application to ZhengzhouWanzhou Highspeed Railway Tunnel Construction
[J]. Tunnel Construction, 2018, 38(8): 1361-1370.
|
[15] |
GONG Chenjie, DING Wenqi.
Waterproof Properties of Elastic Sealing Gaskets Used in Segmental Joints of Largediameter Underwater Shield Tunnels: Design Methodology and Engineering Guidance
[J]. Tunnel Construction, 2018, 38(10): 1712-1722.
|